Loading...
20110126055701755.pdfCITY OF EDMONDS ENGINEERING REQUIREMENTS FOR SHORT PLATS Name:W File, No.: PLN20090004 Reviewed by: Jeanie McConnell- __��2rch 26 2012 Address: '17626 OVD Engineering Division Date Fid GR ROMNTS-Spasojevic 2 -lot SP 1 of 3 Required as a Condition of Subdivision Re aired asa- 11 Condition of SFR Building Permit Requirement Already Satisfied 1. Ri-ght:2f Way Decflcatirn for Public Streets., a) NA 2. Public Street Improvements (Asphalt, curb, gutter and sidewalks): a) Curb, Gutter and sidewalk completed with City of Lynnwood project. x b) Lats 1 & 2 shall take access off Olympic View Drive at established locations. _"private A-cces x a) Provide asphalt or concrete driveway approach to Lot 1. ) �Slope�ct driveways sha@I not exceed 1 1. and shall be noted as such on the civils. X x 4Street Turnaround: a) Provide on-site turnaround for Lots 1 & 2 to City Standards. x x ..J t Ut rather utilities): � a) Provide all easements as required....- x 6.Street Lights; N�/A 7. Plantinfl Strip: N/A Water a) Public hydrant spacing shall meet requirements of ECDC 19.25, b) Provide waterservicestub to each Lot x c) Connect to public water system. x 9. Sanitary Sewer System improvements- - a) Provide 6" sewer service lateral to serve Lots A & B, with a 6" cleanout at the right-of-way line. Where sewer service lateral is shared by more than one lot, it shall be 6", x W_ -PI-Vide new 4" _side sewer to individual lots. X x Fid GR ROMNTS-Spasojevic 2 -lot SP 1 of 3 c) Connect to public sewer system. 10. Storm Sewer S stem lm rovements; a) th Provide a Stormwater Management report and plan. aterrl'Manualance 'is X ECDC 18.30 and 1992 Department of Ecology required. rdetention system b) Construct privately awned and maintained stom sized to provide adequate capacsrvIousra areas and sstoposed 'reet improvements or existing lX family dwellings, associated imp stem to be located in accordance with ECDC 18.3D. Storm detention system on private property. X envious surfaces to storm detention system as well X c) Connect all new imp X as any existing surfaces created post 1977. d) Provide storm sewer stub to all proposed lots. X .X e) Connect io public storm system X 11. Underground Wirin er Ord. 1307: X a) Required for all services provided to proposed lot. Excavation and Gradin er IBC X X 12. X a) Submit a grading plan as part of engineered site plan. b) Submit grading plan for foundations witfi building permit_ 13 Si na a er Cit En ineer X a) Provide fire and aid address signage. 14. .Survey Monumentation Ener Ord.sect. 12.10.120 5. '. As-butit< uraw�U� : � --- a} Provide an as built drawing of all street and u in .dwg format and a hard copy. 16 Other Re trireme a} Plat showing lots, easements, legals, survey b) Legal documents for each lot G) Fietd stake lot corners (by professional SUM Fie4d stake utilit stubs at property lines d} y e) Clustered mailbox location per Postmaster f) Maintenance agreements g) Traffic impact Analysis 17. F -n ineerin EE b) Storm system development charge c) Sewer connection fes d) Water connection fee e) Water meter fee - 314' meter f) Traffic mitigation fee per SFR g) Short flat review fee ENGR RQMNTS-Spasojevic 2 -lot SP t ineer . ' improvements both X $840.72 $1,000.00 X X X X 2 of 3 Required as a Requirement Required as a Condition of Already Condition of SER Building Satisfied Subdivision Permit X c) Connect to public sewer system. 10. Storm Sewer S stem lm rovements; a) th Provide a Stormwater Management report and plan. aterrl'Manualance 'is X ECDC 18.30 and 1992 Department of Ecology required. rdetention system b) Construct privately awned and maintained stom sized to provide adequate capacsrvIousra areas and sstoposed 'reet improvements or existing lX family dwellings, associated imp stem to be located in accordance with ECDC 18.3D. Storm detention system on private property. X envious surfaces to storm detention system as well X c) Connect all new imp X as any existing surfaces created post 1977. d) Provide storm sewer stub to all proposed lots. X .X e) Connect io public storm system X 11. Underground Wirin er Ord. 1307: X a) Required for all services provided to proposed lot. Excavation and Gradin er IBC X X 12. X a) Submit a grading plan as part of engineered site plan. b) Submit grading plan for foundations witfi building permit_ 13 Si na a er Cit En ineer X a) Provide fire and aid address signage. 14. .Survey Monumentation Ener Ord.sect. 12.10.120 5. '. As-butit< uraw�U� : � --- a} Provide an as built drawing of all street and u in .dwg format and a hard copy. 16 Other Re trireme a} Plat showing lots, easements, legals, survey b) Legal documents for each lot G) Fietd stake lot corners (by professional SUM Fie4d stake utilit stubs at property lines d} y e) Clustered mailbox location per Postmaster f) Maintenance agreements g) Traffic impact Analysis 17. F -n ineerin EE b) Storm system development charge c) Sewer connection fes d) Water connection fee e) Water meter fee - 314' meter f) Traffic mitigation fee per SFR g) Short flat review fee ENGR RQMNTS-Spasojevic 2 -lot SP t ineer . ' improvements both X $840.72 $1,000.00 X X X X 2 of 3