20110126055701755.pdfCITY OF EDMONDS
ENGINEERING REQUIREMENTS FOR SHORT PLATS
Name:W File, No.: PLN20090004
Reviewed by: Jeanie McConnell-
__��2rch 26 2012 Address: '17626 OVD
Engineering Division Date
Fid GR ROMNTS-Spasojevic 2 -lot SP 1 of 3
Required as a
Condition of
Subdivision
Re aired asa- 11
Condition of
SFR Building
Permit
Requirement
Already
Satisfied
1. Ri-ght:2f Way Decflcatirn for Public Streets.,
a) NA
2. Public Street Improvements
(Asphalt, curb, gutter and sidewalks):
a) Curb, Gutter and sidewalk completed with City of Lynnwood project.
x
b) Lats 1 & 2 shall take access off Olympic View Drive at established
locations.
_"private A-cces
x
a) Provide asphalt or concrete driveway approach to Lot 1.
) �Slope�ct driveways sha@I not exceed 1 1. and shall be noted as such
on the civils.
X
x
4Street Turnaround:
a) Provide on-site turnaround for Lots 1 & 2 to City Standards.
x
x
..J t Ut rather utilities): �
a) Provide all easements as required....-
x
6.Street Lights;
N�/A
7. Plantinfl Strip:
N/A
Water
a) Public hydrant spacing shall meet requirements of ECDC 19.25,
b) Provide waterservicestub to each Lot
x
c) Connect to public water system.
x
9. Sanitary Sewer System improvements-
- a) Provide 6" sewer service lateral to serve Lots A & B, with a 6" cleanout
at the right-of-way line. Where sewer service lateral is shared by more
than one lot, it shall be 6",
x
W_ -PI-Vide new 4" _side sewer to individual lots.
X
x
Fid GR ROMNTS-Spasojevic 2 -lot SP 1 of 3
c) Connect to public sewer system.
10. Storm Sewer S stem lm rovements;
a) th
Provide a Stormwater Management report and plan.
aterrl'Manualance 'is X
ECDC 18.30 and 1992 Department of Ecology
required.
rdetention system
b) Construct privately awned and maintained stom
sized to provide adequate capacsrvIousra areas and sstoposed 'reet improvements or existing lX
family dwellings, associated imp stem to be located
in accordance with ECDC 18.3D. Storm detention system
on private property. X
envious surfaces to storm detention system as well X
c) Connect all new imp X
as any existing surfaces created post 1977.
d) Provide storm sewer stub to all proposed lots. X .X
e) Connect io public storm system X
11.
Underground Wirin er Ord. 1307: X
a) Required for all services provided to proposed lot.
Excavation and Gradin er IBC X X
12. X
a) Submit a grading plan as part of engineered site plan.
b) Submit grading plan for foundations witfi building permit_
13
Si na a er Cit En ineer X
a) Provide fire and aid address signage.
14. .Survey Monumentation
Ener Ord.sect. 12.10.120
5. '. As-butit< uraw�U� : � ---
a} Provide an as built drawing of all street and u
in .dwg format and a hard copy.
16 Other Re trireme
a}
Plat showing lots, easements, legals, survey
b) Legal documents for each lot
G) Fietd stake lot corners (by professional SUM
Fie4d stake utilit stubs at property lines
d} y
e) Clustered mailbox location per Postmaster
f) Maintenance agreements
g) Traffic impact Analysis
17. F -n ineerin EE
b) Storm system development charge
c) Sewer connection fes
d) Water connection fee
e) Water meter fee - 314' meter
f) Traffic mitigation fee per SFR
g) Short flat review fee
ENGR RQMNTS-Spasojevic 2 -lot SP
t ineer . '
improvements both X
$840.72
$1,000.00 X
X
X
X
2 of 3
Required as a Requirement
Required as a
Condition of Already
Condition of
SER Building Satisfied
Subdivision
Permit
X
c) Connect to public sewer system.
10. Storm Sewer S stem lm rovements;
a) th
Provide a Stormwater Management report and plan.
aterrl'Manualance 'is X
ECDC 18.30 and 1992 Department of Ecology
required.
rdetention system
b) Construct privately awned and maintained stom
sized to provide adequate capacsrvIousra areas and sstoposed 'reet improvements or existing lX
family dwellings, associated imp stem to be located
in accordance with ECDC 18.3D. Storm detention system
on private property. X
envious surfaces to storm detention system as well X
c) Connect all new imp X
as any existing surfaces created post 1977.
d) Provide storm sewer stub to all proposed lots. X .X
e) Connect io public storm system X
11.
Underground Wirin er Ord. 1307: X
a) Required for all services provided to proposed lot.
Excavation and Gradin er IBC X X
12. X
a) Submit a grading plan as part of engineered site plan.
b) Submit grading plan for foundations witfi building permit_
13
Si na a er Cit En ineer X
a) Provide fire and aid address signage.
14. .Survey Monumentation
Ener Ord.sect. 12.10.120
5. '. As-butit< uraw�U� : � ---
a} Provide an as built drawing of all street and u
in .dwg format and a hard copy.
16 Other Re trireme
a}
Plat showing lots, easements, legals, survey
b) Legal documents for each lot
G) Fietd stake lot corners (by professional SUM
Fie4d stake utilit stubs at property lines
d} y
e) Clustered mailbox location per Postmaster
f) Maintenance agreements
g) Traffic impact Analysis
17. F -n ineerin EE
b) Storm system development charge
c) Sewer connection fes
d) Water connection fee
e) Water meter fee - 314' meter
f) Traffic mitigation fee per SFR
g) Short flat review fee
ENGR RQMNTS-Spasojevic 2 -lot SP
t ineer . '
improvements both X
$840.72
$1,000.00 X
X
X
X
2 of 3