Loading...
20110128160113370.pdfEDA City of Edmonds PLATA REVIEW COMMENTS :< BUILDING DIVISION FS, g9a (425) 771-0220 DATE: 1/27/2011 TO: Glen and Debbie Read 2123 NW 204"' St Shoreline, WA 98177 RE: Plan Check: BLD20100999 Project: SFR Project Address: 9947 Water St During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Complete the attached city "Special Inspection and Testing Agreement". 2. Architect to stamp and sign plans, or remove references to architect from plans. Designer/architect appears in some notes, e.g. general notes #5/A1.1. State law requires the design professional to stamp and sign all public submittals. 3. Smoke alarm missing in bedroom #3. 4. Note that outside combustion air and tight fitting doors are required on indoor fireplaces. 5. Provide door specifications on accordion type doors separating indoor great room from outdoor great room. 6. Indicate safety glazing locations, e.g. master soaking tub and guest suite glazing within 24" of man door of guest suite. 7. Indicate minimum tread width at walkline at radiused stairs. 8. Detail 23/D-10 incorrectly shows the 10" minimum tread measurement from tread kick, plate surface to leading edge of nosing, instead of the correct leading edge to leading edge. 9. Minimum 2" clearance to framing at the masonry fireplace detail. 10. Engineer of record: Justify with calculations the 32" lag bolt spacing for the proposed ledger attachment detail U/S2 (for withdrawal) 11. Provide details/notes for geotechnical report requirements on plans: a. Slab on grade rebar size and spacing and subgrade requirements. b. 10 mil. s.o.g. vapor barrier. c. Footing drain detail and termination location. 12. Provide whole house ventilation calculations per M1508, and identify the means of complying with this section. Pat Lawler, CBO Plans Examiner/Building Inspector 425 7710220 x1703 OF EDk o� SPECIAL INSPECTION AND TESTING AGRE EMENT Permit #: Jo to - ; 9 2 Project: Prior to issuance of a permit, this form must be completed in its entirety (incl returned to the City for approval. The completed form must lunve signatures of acknowledgment by rill parties. DMFS AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masonry ❑ Structural Steel/Welding ❑ High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation Grading/soils ❑ Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect, If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted, The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed, Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforrvng work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report, LABuilding New Folder 2010\Forms\Specia1 inspection form.doc10/25/2010 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the j obsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Desii?n Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perforin in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: Arch./Eng: Signature Signature Signature. Special Insp. Signature ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. By: Date: LABuilding New Folder 2010\Forms\Special inspection form.docl0/25/2010 Date Date: Date: Date: