Loading...
2011-0196 Panera.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 2, 2011 TO: Jennifer Patterson jpatterson@arcv.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2011-0196 Project: Panera Bread Project Address: 7929 Lake Ballinger Way During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. This review includes structural and non-structural. Non-structural 1.Please note the Electrical Department Contact listed on sheet G-CS is the Washington State Department of Labor and Industries, not Leonard Yarberry. This item may be redlined on the current submittal if you wish. 2.Please submit the proper energy compliance forms for the 2009 Energy Code. These include the Interior and Exterior Lighting Summary forms; Energy Metering; and either the Building Envelope form or the Table 13-1 worksheet from the 2009 WSEC. All of these forms and code text are available on www.neec.net. Provide all applicable information on the plans, such as wall and roof insulation, slab perimeter insulation, vapor barriers, U values for windows, etc. 3.On sheet A-0.54 change the reference for R19 wall insulation to R21 (assuming a prescriptive approach to envelope energy compliance is used.) 4.On sheet A-1.1 symbols 2.4 and 2.5 seem to be mis-applied. 5.Detail 13/G-ADA-1.2 shows an exterior ramp on the north side of the building. The minimum length of the top and bottom landings must be 60 inches in direction of ramp travel. Also, provide adequate space for the adjacent handrails to extend at the top and bottom without projecting into the required walkways. (See detail 12 on this same page for correct configurations.) IBC 1010.6.3 6.Attached are Special Inspection Agreement forms for Soils and for Structural. Please obtain all applicable signatures and return forms for city review. Structural 7.EOR, both the calculations and the plans indicate use of the 2006 IBC. Please show that the structure is designed under the 2009 IBC and make all necessary changes to the project documents to show this. 8.Provide a design analysis for the grade beams and the pile foundation. 9.Provide the missing information for reinforcing in the Pile Footing Schedule on sheet S-1.3. 10.Provide calculations for the (3) roof glulams on gridlines 7, I and J. 11.Detail 104 shows a connection of the slab to the existing foundation wall. On the foundation plan this detail is also called out as typical in the new foundation sections, however it is unclear if it actually applies to the new sections, since detail 103 does not show the same connection to the slab. Please clarify how these 2 details apply. 12.The shearwall calculations show the use of ½ inch plywood; however the shearwall table on the plans shows 3/8 inch plywood. Please justify the use of the thinner plywood, or otherwise clarify the design. Mechanical 13.Please provide structural calculations and details for the seismic attachments of the (4) rooftop air handlers, as they exceed 400 pounds. Include attachments for curb-to-roof as well as unit-to-curb. Plumbing 14.Please provide gas piping plans and calculations. Page 2 of 2