Loading...
2011-0486 Ayers ADU Addition.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: June 30, 2011 TO: Tom Leren The Leren Company Email: tom@lerendesign.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2011-0486 Project: Ayers Addition th Project Address: 1225 7 Avenue S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Marie Harrison, Senior Permit Coordinator. 1.Please show on the plans a one hour fire rated wall between the existing house and the new ADU. It would be acceptable to design the wall with 5/8 inch Type X drywall on the new side, assuming there is at least ½ inch drywall on the existing side of the wall. These elements, combined with the wood stud framing and fiberglass insulation will provide the required level of protection. IRC 302.3 and IBC 721.6 2.What will be the primary heat source for the ADU? Please indicate on the plans that there will be a separate programmable thermostat for the ADU heating system. WSEC 503.8 3.The whole house ventilation system shown on the plans indicates an exhaust fan on a timer as described in IRC M1508.4. Please indicate how outside air will be provided to each habitable room to satisfy M1508.4.5. 4.Provide specifications for the closed cell ceiling insulation to show a listing by one of the standards listed in IRC R316.6. This may be listed as a deferred submittal, however, the material must be approved by the building department prior to installation.