2011-0515 UMC Mechanical.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: July 8, 2011
TO: Mike Mesneak
MM Comfort Systems, Inc.
Email: Mmesneak@mmcomfortsytems.com
FROM: Leif Bjorback, Assistant Building Official
RE: Plan Check: 2011-0515
Project: United Methodist Church
Project Address: 828 Caspers St
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to Marie Harrison, Senior Permit
Coordinator.
1.Please provide outside air calculations for each fan coil unit as required by IMC 403. If the
tabular values from Table 403.3 are not used, please show calculations that comply with the
exceptions allowed in sections 403.2 and 403.3.