20110603090940240.pdfMAX PERCENT COVERAGE
N/A
MAX COVERAGE AREA
PROF05EV COVERAGE AREA
4,945
PROF05EV PERCENTAGE
41,1%
ARE EAVES ABOVE EARTH INCLUDED?
YE5
o -0
1
4945
ar
a. 11,k'
20
120.16
AVE GRAVE CALL: NE 9-7.05, NN 95.35
O
Q
r
r
Q
r
to
15b
q e
ro ;7-1(, 13
5,
It
0 Ave,
56
Ion
I— fl�Ll 994-5
tve
-
CAVC
j
r
Al
40
U,
NORTH
19,
54 ; v,/
(J
06 08 V6
(4 1 VV%
�rvwvvmWovl ())-gne
SITE PLAN
0
lbGAILK
xiv
\j
IMPERVIOUS SURFAaS
150 FT IMFERV. AREA POST "71 PRE 1717 TOTAL
MAX PERCENT COVERAGE
N/A
MAX COVERAGE AREA
PROF05EV COVERAGE AREA
4,945
PROF05EV PERCENTAGE
41,1%
ARE EAVES ABOVE EARTH INCLUDED?
YE5
HOU5E,/(5ARA6E 524
5140
5464
FORCH/EAVE5 INCL. AE3\/
ALPial I -q
Front (2
Tm
... ........... .. . . ....
3ides /,//3 v
o -0
1
4945
ar
a. 11,k'
20
120.16
AVE GRAVE CALL: NE 9-7.05, NN 95.35
15N 85.55, 5E qb.( ( 5 = 55-7.65 TOTAL
HOU5E,/(5ARA6E 524
5140
5464
FORCH/EAVE5 INCL. AE3\/
REF, DATUM BASE ELEVATION
PATIO/YV,LK5
Tm
DRIVEWAY i02
-102
,TOTAL 524 461-1
4945
HEIGHT LIMIT CALCULATION
REF. DATUM LOCATION: WATER METER, LID
REF, DATUM BASE ELEVATION
100.00
AVERAGE GRADE (5EE CALL)
96.81
MAXIMUM HEIGHT LIMIT IN FT
25.00
MAXIMUM HEIGHT ELEVATION
121A1
FROP05EV HIGHEST ELEVATION
120.16
AVE GRAVE CALL: NE 9-7.05, NN 95.35
15N 85.55, 5E qb.( ( 5 = 55-7.65 TOTAL
J
FRE C" EIVED
APR I (S' 2 0 11
DEVELOPMEN't SERVIC;FS
COUNTER