Loading...
20110608082756620.pdfVI VD'tf City ® Edmonds o Traffic Impact Analysis Worksheet Name of Proposed Project: '�, 4e'11 Owner/Applicant Naive // 710 Street/Mailing Address City State Zip Telephone( /%GGA Applicant Contact Person: CMZ Name Street/Mailing A dress City ! State Zip Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Finn Name Contact Name Telephone: E-mail: THRESHOLD LEVELS OF ANALYSIS Project Traffic Levels Sections to Complete I. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Checklist) II. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a, Location - Street address:I'� (Attach a vichtitry map and site plait) b. Specify existing land use: c. Specify proposed type and size of development: 1 of residential units and/or square footage of building) Revisedon n 6121110 E82 - Traffic Impact Analylsis J'Vorksheet Page 1 of 5 7, MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts, Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table d. (attached) and as identified in ECDC 18.82.120, except as otherwise. provided for independent fee calculations in ECDC 18.82.130. 11 CHANGE IN USE Fee for prior use shall be based on fee established at the tirrie the prior use was permitted. If the previous use was pennitted prior to the adoption of Ordinance 3516 (effective date: 09'/12/04), the 2004 FC DC 18,82,120 impact fee shall be used. Units in square Bee of dwelling, Vf 1, etc, X Rm X =New Use 0 Prior 1 Fee. Prior Use F= U NEW IDEVE LOPMENT I Units in ITE Land Use Category it nU Per sqUarC feet, Per Unit Fee Rate 9 of dwelling, New Use $ X kTION: $200.00 (+ consultant feed $ TOTAL TRAFFIC IMPACT FEE $ ng'Diioon Approval NO- ' No finpact fees will be due, nor will a credit be given, for an impact fee calculation resultbig in a net negative, Revised on 612,1110 E82 - Traffie Impact Analysis TVor1r,5jjpet Page 5 of 5