20110608104738542.pdfDATE: 6/8/2011 TO: Studio Meng Strazzara Attn: Chris Davidson 2001 Western Ave, Ste 200 Seattle, WA 98121 RE: Plan Check: BLD20110410 & 411 Project: Soldier Pile Shoring Project Address: 23014 Edmonds Way During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Provide a letter from the geotechnical engineer of record showing that he has reviewed and approved the shoring plans for compliance with the geotechnical report. 2. Provide a photo monitoring program document signed by the geotechnical engineer, owner, and contractor per page 9 of the geo report. 3. Complete the attached City of Edmonds Special Inspection Agreements. One will need to be completed for each special inspection firm. 4. Shoring engineer of record: a. Include the welding requirements at details 18 and 19/SH2 b. Justify the use of non -pressure preservative treated lagging at "temporary locations". It would seem to be an invitation for the lagging to rot out, and the geotech report indicated a well compacted backfill without deleterious materials intermixed. 5. What type oftemporary and permanent fencing or other method of barricade is proposed for the top of the shoring, and when will it be installed in relation to the timeline of the shoring construction? Pat Lawler, CBO patrick.lawler@ci.edmonds.wa.us Plans Examiner/Building Inspector 425 7710220 x1703 EDT +° SPECIAL INSPECTION AND TESTING AGREEMENT Permit #o Leill Project:'` )4- 52 *St. 1.w, Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masonry Structural Steel/Weldingr; ❑ High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation ❑ Grading/soils Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LABuilding New Folder 2010\Forms\Special inspection form.docl0/25/2010 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: Arch./Eng:_ Special Insp. Signature Signature_ Signature Signature_ ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. In LABuilding New Folder 2010\Forms\Special inspection form.doc10/25/2010 Date: Date Date: Date: Date: OF EDAto� SPECIAL. INSPECTION AND TESTING AGREEMENT C,� N o Permit I,; Y _ Project: anl . St. 189 Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masomy ❑ Structural Steel/Welding ❑ High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation Grading/soils ❑ Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LABuilding New Folder 2010\Forms\Special inspection form.doc 10/25/20 10 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildinjj Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Contractor: Arch./Eng:_ Special Insp. Signature Signature Signature Signature_ ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. Date: LABuilding New Folder 2010\Forms\Special inspection form.doc10/25/2010 Date Date: Date: Date: