Loading...
2011-0635 Harbor Square Lockers.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: August 22, 2011 TO: Warren LaFon 849 Puget Way Edmonds, WA 98020 FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: BLD2011-0635 Project: Harbor Square Athletic Club Locker Room Project Address: 160 West Dayton During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. Thank you. 1.The existing restroom appears to be fully accessible. Altering this restroom shall not reduce the level of accessibility for the building. Provide enough information on the plans to show full compliance to the code for accessible door width, clear floor spaces, grab bars, etc. ANSI A117.1 Section 3411.3 2.Since the office door is to be relocated, verify that the existing office window is safety glazed. IBC 2406.4 3.Show the furniture and equipment in the locker room on the plans. These features must comply with ANSI A117.1 Section 803. 4.Provide a bench in the locker room complying with ANSI A117.1 Section 903. 5.The alterations require accessibility upgrades per WAC 51.50 (IBC 3411.7). On the plans clearly show that the entire interior accessible route of travel complies with current code, or provide upgrades per the previously referenced section. If you choose to use exception #1 of that section, provide a letter stamped and signed by the architect (reference the code exception), stating the overall project cost, 20% of the project cost, and list the accessibility upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20%.