Loading...
2011-0692 Swedish PS Cancer Center.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 15, 2011 TO: Brad Hinthorne Email: Brad.Hinthorne@perkinswill.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2011-0692 Project: Puget Sound Cancer Center th Project Address: 21605 76 Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Linda Thornquist, Permit Coordinator. Thank you. 1.EOR, please justify the use of the MASA anchors to resist shear loads from the floor system (rim joist) to the mudsill to the foundation. It appears that there is an incomplete load path between the rim joist and the mudsill. An engineer at Simpson verified that the tabular design values for the anchor apply only to the mudsill and not the rim joist. Please provide calculations and modified details to address this issue. 2.On detail M/S-202, the note states “Anchor Bolt at Holddown By Others”. This is a necessary element to include on the foundation drawings. Please provide a complete detail of the holddowns and associated anchor bolts. 3.On detail H/S-202, the note states “Pony Walls per K/S-201”. Detail K/S-201 is not a typical detail, while J/S-201 seems to be more applicable. Please clarify the references to these details. 4.Please provide the size and location of the crawl space access. IBC 1209.1 5.Provide on the drawings the locations and overall area of foundation vent openings. IBC 1203.3 6.Provide a minimum 6 mil black visqueen vapor barrier in the crawl space. WSEC 1313.5 7.Please list on the plans all separate permits that will be needed for the project, such as plumbing, side sewer, water meter, fire sprinkler, fire alarm, etc. 8.Sheet G-000 indicates that an L&I drawing set is to be submitted to the City for reference. Please provide this set for nominal review and coordination with state reviewers. 9.Prior to permit issuance, the City will need verification of project review and approval by the Washington State Department of L&I. 10.Please complete and return the attached special inspection agreement forms. There is one each for soils and structural.