Loading...
20110711121608377.pdfEagle Eye Consulting Engineers, Inc. PO BOX 523 Olalla WA 98359 1 • 356-7790 1• • S To: Viking Fire Protection Att: Dwight Bickler 3434 First Avenue South Seattle, WA 98134 Re: Olympic View Water & Sewer District Equipment and Materials Center 23275 Edmonds Way Edmonds, WA 98026 Permit Number # 20110487 EECE EDM 11-01 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes (l4ire S�jp:) essioii only). The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for it e ,S'ulrpr°cssion requirements of this project, All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. V i 'eller Olympic )levy Water S., 'Sewer Dist °icl 3,434 First Avenue South Permit #20110487 FIRE SUPPRESSION COMENTS Sheet FP 1.0 Page 2 of 3 EECT # 11+l"M 11-01. 1. Detail - Riser Diagram: Show an automatic drip valve on the fire department connection detail. NFPA 13, 8.17.2.6 2. Detail - Riser Diagram: Where the riser comes through the floor, show a two inch clear space around the riser. (10 inch hole for a six inch pipe.) The clear space may need to be packed with a flexible waterproof material. NFPA 13, 9.3.4 3. Detail - Riser Diagram: Where the riser passes through the floor of the mezzanine, show a one inch clear space around the pipe. (five inch hole for the three inch pipe). NFPA 13, 9.3.4 4. Detail - Riser Diagram: Indicate the location of the hydraulic data plate to be placed on the riser and indicate the information to be displayed on the hydraulic calculation plate. NFPA 22.1 (31) 5. Sprinkler Symbol Description: Please define on the symbol legend, the sprinkler head shown as a hollow circle inside of a hollow circle. Example: hydraulic point 3 on the ground floor in the vehicle storage area. NFPA 13, 22.1 (13) 6. Ground Floor Fire Protection Plan: In the vehicle storage area, please indicate why you are using the different types/temperature heads throughout. Information required for proper plan review. 7. Ground Floor Fire Protection Plan: Provide information on what is being stored and how it is being stored in the storage rooms. . Information required for proper plan review. 8. Ground Floor Fire Protection Plan: Show a sidewall sprinkler in the elevator pit or provide the exception. NFPA 13, 8.15.5 Sheet FP2.0 9. Mezzanine Fire Protection Plan: : Provide information on what is being stored and how it is being stored in the storage rooms. Information required for proper plan review. (P.n Prn1 10. Provide seismic brace calculations. NFPA 13, 22.1 (3 9) 11. Hydraulic calculations have been checked and found to be acceptable. Olympic Vim Water & Sevver District Flage 3 of 3 3434 First AvenueSouth Permit #20110487 E E E' # EDM I 1 -0 1 Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (206) 356- 7790 between 8:00 a.m. and 5:00 p.m. M Hoyt Jeter PE President