Re: Olympic View Water & Sewer District
Equipment and Materials Center
23275 Edmonds Way
Edmonds, WA 98026
Permit Number # 20110487
EECE EDM 11-01
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes (l4ire S�jp:) essioii only). The following
comments, deficiencies/corrections must be addressed prior to completion of plans review
and subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for it e ,S'ulrpr°cssion requirements of this project,
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
V i 'eller
Olympic )levy Water S., 'Sewer Dist °icl
3,434 First Avenue South
Permit #20110487
FIRE SUPPRESSION COMENTS
Sheet FP 1.0
Page 2 of 3
EECT # 11+l"M 11-01.
1. Detail - Riser Diagram: Show an automatic drip valve on the fire department
connection detail. NFPA 13, 8.17.2.6
2. Detail - Riser Diagram: Where the riser comes through the floor, show a two inch
clear space around the riser. (10 inch hole for a six inch pipe.) The clear space may
need to be packed with a flexible waterproof material. NFPA 13, 9.3.4
3. Detail - Riser Diagram: Where the riser passes through the floor of the mezzanine,
show a one inch clear space around the pipe. (five inch hole for the three inch
pipe). NFPA 13, 9.3.4
4. Detail - Riser Diagram: Indicate the location of the hydraulic data plate to be
placed on the riser and indicate the information to be displayed on the hydraulic
calculation plate. NFPA 22.1 (31)
5. Sprinkler Symbol Description: Please define on the symbol legend, the sprinkler
head shown as a hollow circle inside of a hollow circle. Example: hydraulic point 3
on the ground floor in the vehicle storage area. NFPA 13, 22.1 (13)
6. Ground Floor Fire Protection Plan: In the vehicle storage area, please indicate why
you are using the different types/temperature heads throughout. Information
required for proper plan review.
7. Ground Floor Fire Protection Plan: Provide information on what is being stored and
how it is being stored in the storage rooms. . Information required for proper plan
review.
8. Ground Floor Fire Protection Plan: Show a sidewall sprinkler in the elevator pit or
provide the exception. NFPA 13, 8.15.5
Sheet FP2.0
9. Mezzanine Fire Protection Plan: : Provide information on what is being stored and
how it is being stored in the storage rooms. Information required for proper plan
review.
(P.n Prn1
10. Provide seismic brace calculations. NFPA 13, 22.1 (3 9)
11. Hydraulic calculations have been checked and found to be acceptable.
Olympic Vim Water & Sevver District Flage 3 of 3
3434 First AvenueSouth
Permit #20110487 E E E' # EDM I 1 -0 1
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (206) 356-
7790 between 8:00 a.m. and 5:00 p.m.
M
Hoyt Jeter PE
President