DATE: 7/27/2011
TO: Ron Johnson Architect
1960123 rd Ave NW
Shoreline, WA 98177
RE: Plan Check: BLD20110563
Project: O'Domlell Garage
Project Address: 841 Elm Way
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator.
1. Complete attached City of Edmonds special inspection agreement.
2. The peeler poles are to be Pressure preservative treated due to exposure to wind driven rain and
the proximity of the poles to grade.
3. Engineer of record:
a. Provide lateral justification for the covered porch. Include connections for the
footing, columns, glu lam beam, and rafters.
b. Identify hurricane clip requirements at rafter locations, or justify not needing them.
c. How does the shearwall "drag" the shear across the rear, mostly glass wall, from the
existing SWI? Is some sort of drag stint or strap connection in order?
4. The stairs, as drawn appear to only have 6 feet of headroom at the existing cantilevered
fireplace. Provide a detail to show how this will comply with the minimum 6'8" required
headroom. The note on the plans calls for the 6'8", but does not show how this can be
physically accomplished.
5. Indicate the over -excavation on the plans for the 3 feet below the garage slab and 18 inches
below the driveway, per geotech report.
6. Justify 8 inch tie beam not having minimum cover for frost protection, as indicated in detail 5/4.
7. Pin piles are to be galvanized of bituminous coated paint per geotech, and should be identified
as such on plans.
8. Indicate a smoke detector upgrade is required to 110v interconnected with battery backup to
existing house.
9. Indicate the required �/z gypsum wallboard at the separation wall.
Pat Lawler, CBO
patrick.lawler@ci.edmonds.wa.us
Plans Examiner/Building Inspector
425 7710220 x1703
OV EDAfO
SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #: Q .3 Project:
�St. 1891
Prior to issuance of a permit, this farm must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
❑ Reinforced Concrete
❑ Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
❑ Structural Masonry
I Structural Steel/Welding
❑ High Strength Bolting
❑
Spray applied Fireproofing
❑
Smoke Control Systems
❑
Lateral Wood
❑
Structural Observation
Grading/soils
El
g
Other W NVQ&
❑
Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
LABuilding New Folder 2010\Forms\Special inspection form.doc10/25/2010
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work, to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner:
Signature Date
Contractor:
Signature Date: