20110803111521191.pdfOV EDA',o City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: 7/28/2011 TO: Rob Krebs 9902 224"' St SW Edmonds, WA 98020 RE: Plan Check: BLD20110550 Project: Home Addition Project Address: same During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Pennit Coordinator. 1. Provide gravity calculations for all major point loads to footings. There appear to be missing beams and footings, some of which are identified below. 2. Foundation Drainage: a. Add filter fabric over washed drain rock sub -soil drain. b. Minimum 4 inches of rock surrounding sub -soil drain UPC 1104.5.1 c. Add sub -soil drain at new foundation where adjacent to existing crawl space see section A/5.0 3. Foundation: a. Provide dampproofing requirements per R404.1 b. Dowel new foundation into existing at all new rebar locations. c. The existing foundation at the crawl space adjacent to the new basement will need to be removed and replaced with a completely new foundation, not just a new foundation poured beneath the existing chopped off foundation. The old foundation no longer meets code, and will need to be removed. d. Footing appears to be missing at interior end of great room GLB adjacent to existing masonry fireplace. e. Indicate maximum height of unbalanced fill. 4. Deck: a. Provide guard details showing framing members and how they are attached and meet the minimum load requirements of Table 301.5 b. The deck appears to be missing a beam and two footings, in line with the edge of the addition, where the 2x10 joist at 16" o.c. will not span 20'. c. Identify the correct footing size, depth, and reinforcement. Two footings have a roof loads, as well as two levels of floor loads. The depth of earth cover is minimum 18 inches. The foundation plan calls for 2 foot square footings, while the building section calls for 14"x14"xl2" piers. d. Indicate the straps required to connect the deck floor and roof beams to the walls at the top plate levels. e. Z flashing at ledger. f Calculations for 4x4 posts carrying both the floor and roof loads. 5. Floor Framing: a. Missing beam capable of carrying roof load above bedroom 3. b. Indicate comlection of steel beam to wall/posts. c. Indicate method to attach plate carrying top flange hangers to steel beam (e.g. all - thread stubs welded to beam at 24" o.c.). d. Indicate the connection for the steel beam to the wall. 6. Ceiling Framing: a. By removing the dining room walls, the 2x6 ceiling joists appear to be severely over spanned. 7. General Notes: a. Remove references in the general notes to the WA State VIAQ. IRC chapter 15 replaces the ventilation code. b. Maximum 2.5 GPM for shower heads, not 3.0. 8. Basement: a. Missing interconnected smoke detector b. Missing egress window, perhaps window well. c. Six mil black visqueen tinder slab on sections/details. d. The basement plan (A-2.0) shows a 12' wide basement but scales to 10', and the deck shows 18' wide, while the main floor plan shows a 20' wide deck. The cross section should also identify the correct size framing members. e. Method of dampproofing per R406.1 9. Identify whole house fan and method of providing outside air per IRC section 1508. 10. Minimum R-49 ceiling insulation. 11. Indicate a smoke detector upgrade is required to 110v interconnected with battery backup to existing house. 12. Provide a valuation of the interior remodel portion of the existing structure for permit fee purposes. Pat Lawler, CBO patrick.lawler@ci.edmonds.wa.us Plans Examiner/Building Inspector 425 7710220 x1703 Page 2 of 2