Loading...
2011-0834 Subway Plumbing.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 7, 2011 TO: Bradley Williams Williams Mechanical Email: Brad@williams-mechanical.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2011-0834 Project: Subway Plumbing Project Address: 10016 Edmonds Way During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Marie Harrison, Senior Permit Coordinator. Thank you. 1.Please show on the plans individual drain systems for those fixtures draining to the grease interceptor and those draining directly to the sanitary sewer. As per comments from Jon Lein, Wastewater Treatment reviewer, given during review of the TI permit, connect the 3 compartment sink and the mop sink to the GI, and route everything else to the sanitary sewer. Note that under plumbing permit 2011-0660, building sewer stubs have been approved to be installed serving suites C and D.