PLAN REVIEW COMMENTS
BUILDING DIVISION
Esq s�a (425) 771-0220
DATE: 9/7/2011
TO: Randy Munsen C/O
Chermak Construction
655 Edmonds Way
Edmonds, WA 98020
RE: Plan Check: BLD20110712
Project: Spayd carport
Project Address: 8712 Olympic View Drive
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator.
1. Provide gravity and lateral engineering calculations with frill sized stamped plans consistent
with the GEO geotechnical report dated June 9, 2011. Include the structural slab.
2. Complete attached City of Edmonds Special hlspection Agreement for the geotechnical
monitoring during pipe pile placement.
3. Identify the method and locations of water management solutions consistent with the
geotechnical report, including footing and/or french drain termination locations.
Pat Lawler, CBO
patrick.lawler@ci.edmonds.wa.us
Plans Examiner/Building hlspector
425 771 0220 x1703
OF EDr0
SPECIAL INSPECTION AND TESTING AGREEMENT
ENT
U~ �
Permit #a II-01
�St. 189
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
❑ Reinforced Concrete
❑ Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
❑ Structural Masonry
❑ Structural Steel/Welding
❑ High Strength Bolting
❑ Spray applied Fireproofing
❑ Smoke Control Systems
❑ Lateral Wood
❑ Structural Observation.
❑ Grading/soils
El Other,
❑ Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
LABuilding New Folder 2010\Forms\Special inspection form.doc10/25/2010
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and -the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans.. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner:
Contractor:
Arch./Eng:_
Special hasp.
Signature
Date
Signature
Date:
Signature
Date:
Signature Date:
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT.
Date:
LABuilding New Folder 2010\Forms\Special inspection form.docl0/25/2010