Loading...
20111006114014685.pdfOf EDgt� City of Edmonds AN REVIEW COMMENTS " BUILDING DIVISION �� lg90 (425) 771-0220 DATE: 10/6/2011 TO: H Todd Kilburn Architects Attn Barbara Busetti 1661 East Olive Way Suite 200 Seattle, WA 98102 RE: Plan Check: BLD20110829 Project: El Capitan Canopy Project Address: 200 James Street During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Complete attached City of Edmonds special inspection agreement. 2. The NU -Ray series 3000 metal roofing architectural specifications recommend a minimum 3/12 pitch slope and securing the panels at 24 inches spacing which would apparently require the framing to be at 24 inches on center. The 3000 series also comes in 24 or 26 gauge thieluless. The intermediate framing support for the metal roofing is about 3'6", so identify the gauge and justify the support framing spacing. It appears that the roofing supports may be overspaced. Provide installation instructions to show that an underlayment is not required to prevent condensation from dripping from the metal roofing. 3. The El Capitan is located in a relatively close position to the Sound. Identify if the fasteners are to be stainless steel, hot dipped galvanized or otherwise corrosion resistant. 4. The North Elevation 6/A-1 shows an additional tie -rod at the longer sparmed channel, but this is not shown on the structural. 5. Include all engineering details on the full sized plans, e.g. calc sheet 20 shows the location of the plate welded to the channel. 6. Provide flashing details at gutter, fin wall, and roofing to chamlel intersections parallel with the slope of the roofing, IBC 1503.2. Pat Lawler, CBO patrick.lawler@ci.edmonds.wa.us Plans Examiner/Building Inspector 425 771 0220 x 1703 OF Eb O SPECIAL INSPECTION AND TESTING AGREEMENT ENT U N Permit #: Pro, ect: St 1g9� r t Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masonry ❑ Spray applied Fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation ❑ Grading/soils JQ Structural Steel/Welding ❑ Other ❑ High Strength Bolting ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LABuilding New Folder 2010\Forms\Special inspection form.docl0/25/2010 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the j obsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. IDI►1are] me) 0101WIN I A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Signature Date Contractor: Signature Date:. Arch./Eng: Signature Date: Special Insp. Signature Date: ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. By: Date: LABuilding New Folder 2010\Forms\Special inspection form. doe 10/25/2010