2011-1031 Key Bank.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: January 26, 2012
TO: Joel Howitt
Email: JHowitt@barghausen.com
FROM: Leif Bjorback, Assistant Building Official
RE: Plan Check: 2011-1031
Project: Key Bank
Project Address: 9930 Edmonds Way
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator.
1.Please clarify how the accessible teller station complies with the accessibility provisions of
ANSI A117.1 section 904.3 for service counters for size and height.
2.Please provide structural calculations by a Washington State licensed professional engineer
for the seismic tie-downs for RTU1 and RTU2, as they both exceed 400 pounds. Include
details for attachments of unit-to-curb as well as curb-to-roof.
3.The plumbing plans show a single 3 inch vent for the entire DWV system. The cross-
sectional aggregate area of the vent(s) must not be less than that of the building drain, which
is 4 inches. UPC 904.1
4.Special inspections have been identified for the project. Please obtain signatures for, and
return the attached special inspection agreement form.