20111230105116648.pdfJust a reminder
Mailing Address
Job Address
Building Permit l 1 • For: ,
Issued on Expires: I
All required inspection(s) must be completed by the expiration date.
[ ] If more work must be done your permit may be renewed by submitting
r newal fees of prior to expiration.
] lease call (425) 771®0220 x 1333 to schedule for inspection(s) if the
or is complete and the permit has not expired. If the permit expires
ithout all required inspection approvals. the matter will be forwarded to
enforcement for resolution
IFTh is not renewable. Please call a Permit Coordinator for
m r inforti ation.
a k You.
h n
u.
DATE MAILED Thank
Buildinq Division