Loading...
20120313054256248.pdf. . . . ...... City of Edmonds 'A MON R IGHT- OF WA Y CONS TI? UC HON PE, RMI TA PPLM, ROW Permit No: ENG ISSUE DATE: EXPIRATION DATE: IS THIS A BLANKET PERMIT: YES JNO ADDRESS OR INTFRSECTION OF CONSTRUCTION: 21211 Pioneer Way PROJECT/OWNER NAME: Pioneer Way Slope Repair / City oi"Edrnonds CONTRACTOR: HWA GeoSciences Inc. STATE LICENSE it: CITY BUSINESS LICENSE M NR-01 6559 hAA11 iKi(,. Annpr- q �. 21312 30th Dr SE Bothell WA 98021 CONTACT:Brad murber I PHONE M (425) 774-0106 EMAIL ADDRESS, bthurber@hwageo.com (Area Code) DESCRIP,r[ON OF PROPOSED WORK (be specific): Three geotechnical borings within the settled area of pavement ---------- I - . ............ . . . . ..... . . . . ......... --.— plus non-destructive Falling Weight Deflectometer (FWD) testing. Total duration of work approximately 1.5 days. See attached eXDloration Dlan with maps and traffic control Dlan. JOBIWORK ORDER # (if applicable): 2011-019-700 Commercial Multi-Family-0 City Project —EL—Subdivision Traffic Control (Onwifl— Single Family Other (Please explain.) 1A This is an EUC PROJECT: PUDE] VERIZON E] PSE U COMCAST OVWSD Ll r—, WAS STREET OVERLAY ED WITH THE LAST FIVE (51 YEARS? YEs— E PAVEMENT cu-r: _ YES JVI No E-L-If Yes, Size Of Cut 8 in. diam. x CONCRETE CUT: YES E- NO E]— If yes, size of cute x IS THIS ROW PERMIT ASSOCIATED WITH ANY PERIMIrrs? ity2�L BUILDING PERMIT #: I ENG. PERMITM �Jr rn March 9, 2012 HWA Project No, 2011-019-700 City of Ip"(111(londs Public, *Works Deparfixient 121 Fifth Avenue Noilli Edmonds, Washington 98020 SUBJECT: GE(1TECHNICAL EXPLORATION PLAN ROW PERMrr APPLICATION PIONEER WAY SLOPE RE PAIR EDMONDS, WASHINGTON This letter provides information regarding proposed geotechnical explorations on Pioneer Way and a traffic control plan for conducting the explorations. 'I'lic work location is on Pioneer Way just north of Bowdoin Way, as shown on the attached Vicinity Map and air photo. 'This work is in support of geotechnical engineering reconiniendations for rehabilitation of the road embankment. PROPOSED ExPLORATIONS' We will conduct a two -stepped exploration program, as follows: 1) We will perform non destructive Falling Weight Deftectorneter (FWD) testing in a gridded pattern within and around the settled portion of the soutlibound lane. The settled area measures approximately 10 feet wide (including shoulder) by 55 feet long. The testing will take up to half a day and consist of using a trailer -mounted drop -weight test at close intervals. 2) We will drill three borings to obtain soil samples and determine soil densities, at 2.5--foot intervals. The borings will be within the pavement with a truck.,, or trailer -mounted hollow -stem auger drill rig. The borings will be approximately it inches in diameter by approximately 15 to 20 feet deep. Soil cuttings from the, auger will be shoveled during drilling into 5--gallon buckets and loaded into a 1--ton pickup, then hauled to a gravel pit for disposal. All soil cuttings will be removed from -the pavement with a flat -nosed shovel, then the pavement will be swept with a broom. Any watery cuttings that cainiot be contained and shoveled along with drier soil cuttings, such that they may pose a hazard of creating silt -laden runoff, will be vacuumed with a shop -vac run by a generator and placed in drums for disposal. The borcholes will be backfilled with I � 0301 h 06vc Sl'' bentonite chips per Ecology requirements and the pavement patched with concrete or permanent cold patch asphalt. Nlarch 9, 2012 HWA Project No. 201 1 -0 19-700 TRAFFIC CONTROL: Each phase of work will require closure of thc.sotithbound lane. Although Pioneer Way is a low-voluiric urban road that could be controlled only with signs ai'O cones per the MUTCD, due to the curve and inclination of the road we propose temporary traffic, control with one flagger at the uphill side of the work area, as shown on the attached T'raftic Control Plan. RLwl'ORATION: All restoration of work sites to similar or better condition than existing will be conducted the same day of drilling, as noted above. DURATION OF WOM: The, work is anticipated to take Y2-day for the FWD testing and one day for the borings. 'rENTATIVE DATES ANt) HOURS OF WORK: Tentatively the FWD testing will occur early in the week of March 19, 2012 and the drilling a few days later. Actual dates will be confirmed once the ROW permit is approved and official notice will be given to the. City at that time. The work will be conducted between 8:OOAM and 5:00 PM, unless otherwise restricted or expanded by the ROW permit. Upon review of this plan, should you have questions or require additional information, please contact this office at your earliest convenience at (425) 7711-0106. Sincerely, HWA Gf-',oScjFNcFs INC. r Brad W. Thurber, LG, LEG Engineering Geologist Attachments: Vicinity Map Air Photo Site Map Traffic Control Plan 2011-019-700 Exploration Plan.doc -2-- HWA GeoScie.jices Tue. it 1 1 07 Oil, , III A201 st 1 03 ol WAS, INWRAVOY CUT, ARPTAC i) VIN