Loading...
2012-0688 Las Brisas Fireplace #3.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 19, 2013 TO: Villa’s Construction Email: villasconstruction@gmail.com FROM: Leif Bjorback, Assistant Building Official rd RE: Plan Check: 2012-0688, 3 review Project: Las Brisas Fireplace th Project Address: 201 5 Ave S Suite 101 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. Previous comments are shown in italics. 1.In order for the City to approve an engineered design for an unlisted system, a greater level of detail is required for us to review the system and determine general compliance with the IFGC, and to guide proper construction and inspection. Please provide design details and specifications for No specifications have been received for the gas burner. Is it listed? How a.The gas burner many BTU? What are the materials and design? We have received the plan sheet drawn by George b.Configuration of the fire pit and table top Hanson, architect; however the design must be from the designer (in this case the engineer) or at least referenced by the engineer. Also, state law requires that submittal documents prepared by a design professional be stamped and signed by the respective design professional. Either a) provide all of the design documents stamped and signed by the engineer of record, or b) provide plan sheets stamped and signed by their respective design professional, with a notation on the engineer’s sheet referencing the architectural design sheet. See comment on 1b above. c.Exhaust canopy Under “Sheet Notes”, change the second triangle figure “2” to a “3”. d.Makeup air system Also, what standards are being used to design the exhaust and makeup air system? What design principle is being used to size the exhaust fan? Please reference the applicable standard and sections used in the design of the system. 2.Response OK. 3.What are the required clearances from the exhaust termination to combustibles; to other physical Your response states to install the portions of the building; to openings into the building? termination per IMC 804.3.4. In order to guide proper installation and inspection, please include the pertinent language from this code section in the plans. Manufacturer 4.Provide manufacturer’s specifications for the Enervex Exhausto chimney fan. specifications have not been received for this fan. Please provide. Please make sure that all design documents are stamped and signed by the engineer of record. 5. 6. Please be aware that plan review fees for mechanical permits are charged by the hour, and with each subsequent review the permit fee will increase accordingly.