2012-1024 Simpson SFR.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: December17, 2012 TO: Scot Simpson scotsimpson@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: 2012-1024 Project: Simpson SFR Project Address: 626 Maple Street During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. General Note: The following are comments made after completing the reviews for building code compliance and of the lateral design of the project proposed in the provided construction documents. A review of the gravity-load bearing structural members/design could not be completed due to the lack of information provided on the ‘Roof Framing Plan’ on page S4 – see comment #31. On page 2: 1.Floor Plan Notes – Change the section reference from ‘R309’ to ‘R302’. 2.Floor Plan Notes – Clarify the wording of the ‘bullet’ “Walls to residence…” to reflect the required dwelling/garage separation of ½ inch gypsum wallboard on the garage side, from top of foundation to the underside of the roof decking, per Table R302.6. 3.Floor Plan Notes – Change the wording of the ‘bullet’ “Ceiling to habitable…” from ‘Ceiling to’ to ‘Garage ceilings with’ to clarify the requirement of Table R302.6. 4.Energy Code Compliance – Clarify the selection of ‘Option IV’ of Table 6-1 of the WSEC. There are only three options available in the 2009 WSEC.. 5.Energy Code Compliance – Change the required ceiling insulation from ‘R-38’ to ‘R-49 or R-38 adv – R-38 if vaulted’ per WSEC Table 6-1. 6.Energy Code Compliance – Item #3 - Clarify the section reference ‘204.2’. The information contained in that section doesn’t appear to apply to water heaters. 7.Energy Code Compliance – Item #4 – Change the legislative reference from ‘WAC 51-48’ to ‘WAC 51-56’. 8.Energy Code Compliance – Indicate the option(s) to be used to develop the additional energy credit per WSEC 901. 9.Roof Ventilation Calculations – Change the net ventilation opening area per vent and column header from ‘sf’ to ‘si’ in the sixth column to reflect likely construction. On page 5: 10.First or Second Floor Plan – Indicate the means to be used to provide the required whole house ventilation per M1508. 11.First or Second Floor Plan – Indicate the location of the electric furnace, the two electric hot water tanks, and the two clothes washers noted on the permit application – also note if a second dryer is to be provided for in addition to the one anticipated in the Laundry Room. 12.Second Floor Plan – Indicate the required source specific exhaust ventilation per M1507 as follows: a.At minimum, a 50 cfm intermittently or 20 cfm continuously operating fan in the bathroom next to the ‘Physical Fitness’ room. b.At minimum, a 50 cfm intermittently or 20 cfm continuously operating fan in the bathroom next to the ‘Leah’s Sewing Room’. 13.Second Floor Plan – Indicate the required smoke alarms per R314 as follows: a.In the bedroom next to the ‘Adventure Room’. b.In the ‘Adventure Room’, just outside of the adjacent bedroom. 14.Second Floor Plan – Indicate the required carbon monoxide alarm in the ‘Adventure Room’, just outside of the adjacent bedroom, per R315. 15. Second Floor Plan – Clarify the means to be used to access the ‘Roof Deck’ represented in the ‘East’ and ‘West Elevations’ on page 6 and referenced by the callout to ‘Designed Member 1.4’ on the ‘Roof Framing’ plan on page ‘S4’. 16.Second Floor Plan – Provide a reference to the stair detail ‘3/S7’ to guide proper construction and inspection. 17.Second Floor Plan – Provide a detail and a reference to it for the required guard(s) at the stairs per R312 to guide proper construction and inspection. 18.First Floor Plan – Clarify the ‘appliance’ represented in the ‘Great Room’. While it appears to be a fireplace, and a chimney is noted on various elevations, none is listed on the permit application. If it is a fireplace, indicate the energy source and the required chimney construction in ‘Leah’s Sewing Room’ on the ‘Second Floor Plan’. 19.First Floor Plan – Indicate the required source specific exhaust ventilation per M1507 as follows: a.At minimum, a 50 cfm intermittently or 20 cfm continuously operating fan in the bathroom next to the laundry room. b.At minimum, a 50 cfm intermittently or 20 cfm continuously operating fan in the Laundry Room. c.At minimum, a 50 cfm intermittently or 20 cfm continuously operating fan in the Master Bathroom. d.At minimum, a 100 cfm intermittently or 25 cfm continuously operating fan in the Kitchen. If an exhaust hood/system of greater than 400cfm is installed or required by the range/cooktop manufacturer, it must be provided with makeup air equal to the exhaust air rate per M1503.4. 20.First Floor Plan - Provide the required makeup air in the Laundry Room per IMC 504.5. Louvered doors or openings/grilles into other spaces may be used to meet the requirements. Other limitations may arise if a gas dryer is installed. 21.First Floor Plan – Indicate the required smoke alarms per R314 as follows: a.In the Master Bedroom. b.In the hallway, just outside of the master bedroom. 22.First Floor Plan – Indicate the required carbon monoxide alarm in the hallway, just outside of the Master Bedroom, per R315. 23.First Floor Plan – Indicate the required safety glazing as follows: Page 2 of 4 a.The 4040 window in the west wall of the Garage per R308.4.7. b.The 4040 window in the east wall of the Garage per R308.4.2. c.The 1050 window adjacent the door into the ‘Relax Room’ per R308.4.2. d.The 2650 windows adjacent each side of the entry door per R308.4.2. 24.First Floor Plan – Indicate the windows in the north wall of the Master Bedroom represented in the ‘North Elevation’ on page 7. 25.First Floor Plan – Clarify the difference in the exterior stairway shown on the west side of the Garage and that represented on page 6. On page S1: 26.General Structural Notes – Foundations – Note #10 – Change the required footing depth below finished grade from ’12 inches’ to ’18 inches’ per R403.1.4.1. 27.General Structural Notes – Foundations – Note #16 – Change the code reference from ‘UBC’ to ‘IBC’ or ‘IRC’. 28.Protection For Reinforcement of Cast In-place Concrete table – Concrete exposed to neither earth or weather – Change the required concrete cover for the ‘No. 5 bars, W31 or D31 or smaller’ from ‘1/2 inch’ to ‘¾ inch’ per R404.1.2.3.7.4. On page S2: 29.Clarify the references to details ‘D4/S7’ and ‘D5/S7’. Details ‘D4/S7’ and ‘D5/S7’ could not be found on page ‘S7’. 30.Provide the required minimum concrete reinforcement for the footing/foundation and the isolated footing construction per R403. On page S4: 31.Clarify the design of the roof framing shown. The location of high-load design elements, such as ‘girder’ and ‘hip-master’ trusses, do not appear to be located or represented on the ‘Roof Framing Plan’ or in the structural calculations for the supporting structural elements below them. Truss drawings shall be submitted to the Permit Coordinator for intake and review of the required bearing/header sizing and point load support prior to truss installation per R802.10.1. 32.Provide a detail, and a reference to it, to guide the proper construction and inspection of the ‘Roof Deck’ drainage system required per R903.4 and UPC 1101.11. On page S5: 33.East-West Section – Clarify the ‘Key Number’ identifier ‘2.11’ for the second floor framing member over the ‘Great Room’. A ‘Designed Member’ identified as ‘2.11’ could not be found among the lists on the provided construction documents. On page S6: 34.Typical Wall Section – Change the required attic insulation from ‘R38’ to ‘R-49’ per WSEC Table 6-1. On page S8: 35.Second Floor Shear Walls and Holdowns – Indicate the required 5’ long and 10’ long ‘P1-6’ shear walls along ‘Shear Plane B’ – noted as shear walls ‘B-1’ and ‘B-2’ on page 13 of the provided structural calculations. Page 3 of 4 36.Second Floor Shear Walls and Holdowns – Indicate the required ‘MST37’ holdowns at each end of the 5’ long and 10’ long ‘P1-6’ shear walls along ‘Shear Plane B’ – noted as shear walls ‘B-1’ and ‘B-2’ on page 13 of the provided structural calculations. 37.Second Floor Shear Walls and Holdowns – Indicate the required ‘MST37’ holdowns at each end of the ‘P1-6’ shear walls along the north wall of ‘Leah’s Sewing Room’ – noted as shear walls ‘C-1’ and ‘C-2’ along ‘Shear Plane C’ on page 14 of the provided structural calculations. 38.First Floor Shear Walls and Holdowns – Provide a reference to the ‘Garage Holdown’ detail on page ‘S6’ to guide proper construction and inspection. 39.First Floor Shear Walls and Holdowns - Indicate the required anchorage type, diameter, length, and embedment for each of the holdowns to guide proper construction and inspection. Information contained in the provided structural calculations could be used to create a ‘Holdown Schedule’ on page ‘S7’. 40.First Floor Shear Walls and Holdowns – Clarify the callout for the holdowns at the following locations: a.The ‘HDU2s’ at each end of the ‘P1-6’ shear walls along the west walls of the Laundry and Master Bedroom – noted as shear walls ‘1-2’ and ‘1-3’ along ‘Shear Plane 1’ on page 9 of the provided structural calculations. b.The ‘HDU5s’ at each end of the ‘P1-3’ shear walls along the east wall of the Garage – noted as shear walls ‘2-1’ and ‘2-2’ along ‘Shear Plane 2’ on page 10 of the provided structural calculations. c.The ‘HDU11s’ at each end of the ‘P1-3’ shear walls along the south wall of the Garage – noted as shear walls ‘A-1’ and ‘A-2’ along ‘Shear Plane A’ on page 12 of the provided structural calculations. d.The ‘HDU5s’ at each end of the ‘P1-6’ shear wall along the south wall of the bathroom by the Garage – noted as shear wall ‘B-1’ along ‘Shear Plane 2’ on page 13 of the provided structural calculations. e.The ‘HDU5s’ at each end of the ‘P1-6’ shear walls along the north walls of the ‘Great Room’ and ‘Relax Room’ – noted as shear walls ‘C-1’ and ‘C-2’ along ‘Shear Plane C’ on page 14 of the provided structural calculations. f.The ‘HDU5s’ at each end of the ‘P1-6’ shear walls along the north wall of the Master Bedroom – noted as shear walls ‘D-1’ and ‘D-2’ along ‘Shear Plane D’ on page 15 of the provided structural calculations. The tension loads listed in the provided structural calculations for the holdowns at the locations noted above exceed the values given by the holdown manufacturer for use with Hem-fir studs – stated as being used in note #33 of the ‘General Structural Notes’ on page ‘S1’, and the ‘Shear Wall Schedule’ and note #3 of the ‘Shear Notes’ on page ‘S7’. The holdown tension values noted on page 8 of the provided structural calculations are for anchorage to Douglas fir or Southern pine framing members. 41.First Floor Shear Walls and Holdowns – Clarify the difference in window placement shown in the south wall of the Kitchen and that represented in the ‘South Elevation’ on page 7, the ‘First Floor Plan’ on page 5, the ‘Main Floor Plan’ on page 8, and as required for the shear wall lengths noted on page 13 of the provided structural calculations. Page 4 of 4