Loading...
2012-1092 Public Works.pdf Ken, in the engineering packet stamped and sealed by Nabil M. Taha, detail S-8 shows wedge anchors at each anchor angle location. The detail also refers to Note D of sheet S0 for additional details. Looking at Note D, item #2 states the builder “shall retain the service of Precision…or a local licensed engineer to design the foundation and anchorage to the foundation of this shelter.” It is this piece that we are missing. It seems that the detail on S-8 gives me part of the attachment detail, but is incomplete, and we also need design calculations for this attachment to the eco-blocks. Feel free to contact me if you have questions. Regards, Assistant Building Official City of Edmonds (425) 771-0220 x1380 Ken: Our Building Department has just one question to ask about the method of attaching the canopies to the ecology blocks and has called the engineering firm that did the drawings and calculations for the understanding. So far, no reply. Can you please give these folks a nudge to do so? It's all that's holding up our permit. Thanks. Jim