Loading...
2012-1103 Chang SFR.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 2, 2013 TO: The Leren Co., Inc. Attn: Tom Leren tom@lerendesign.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: 2012-1103 Project: Chang SFR rd Project Address: 17306 73 Avenue W During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page 3: 1.2009 General & Structural Notes – G. Timber Framing – Note #14 – Clarify the difference in the required minimum header - #2 (2)2x8 DF-L – and that noted on pages 6 & 8 - #2 4x8 DF – to guide proper construction and inspection. On page 4: 2.Concrete Footing Schedule – Footing ‘F-03’ – Change the thickened slab footing thickness from 8” to 12” per R403.1.4.2. On page 6: 3.Indicate the beam type (PSL, Glu-lam, etc.) to be used for the 5-1/4x11-1/4 cantilevered framing member supporting the floor joists below the ‘Family Room’ to guide proper construction and inspection. 4.Indicate the beam type (PSL, Glu-lam, etc.) to be used for the 3-1/2x9-1/4 framing member supporting the floor joists over the opening for the sink and refrigerator in the basement ‘Bonus Room’ to guide proper construction and inspection. 5.Clarify the callout for ‘P-13’ - (2)2x4 cripple studs - below the west end of the #2 6x10 DF beams supporting the floor joists below the Laundry and ‘Bedroom 2’. The required minimum bearing for joists, beams, or girders is 1-1/2 inches across the entire width of the framing member per the American Forest & Paper Association (AF&PA) ‘Wood Frame Construction Manual’. On page 7: 6.Relocate the carbon monoxide alarm or add another in the immediate vicinity of the bedrooms per R315. 7.Provide the required safety glazing for the 3.6x2.0 window in the bathroom by ‘Bedroom 2’ per R308.4.5. 8.Provide the required safety glazing for the 4.0x8.0 window next to the exterior door in the ‘Family Room’ per R308.4.2. 9.Clarify the difference in the amount of braced wall shown along ‘Gridline B’ and that noted on sheet 38 of the provided structural calculations. The 12’3-1/2” long SW1 shear wall has a 3.6x2.0 window that is not noted on sheet 37 of the provided structural calculations. On page 9: 10.Clarify the callout for ‘P-07’ and ‘P-11’ - #2 4x4 DF trimmer posts – below the 5-1/4x11- 1/4 PSL cantilevered beam over the window on the south wall of the ‘Living Room’. The required minimum bearing for joists, beams, or girders is 1-1/2 inches across the entire width of the framing member per the American Forest & Paper Association (AF&PA) ‘Wood Frame Construction Manual’. 11.Clarify the callout for ‘P-08’ - #1 6x6 DF post – below the 6-3/4x21 24F-V4 GLB ‘pitch break’ over the south end of the Kitchen. The required minimum bearing for joists, beams, or girders is 1-1/2 inches across the entire width of the framing member per the American Forest & Paper Association (AF&PA) ‘Wood Frame Construction Manual’. On page 11: 12.Details 1 & 14 – Indicate the required thermal break between the slab edge and the foundation per WSEC Table 6-1 footnote #6. Page 2 of 2