Loading...
20121128082940752.pdfGeotechnical Engineers, Geologists (MG -roup Northwest, Inc. —&Envir-o-r—irn—ental —Scientists August 5, 2009 Jennifer Machuga, Planner Machu, a, of Edmonds, Planning Division 121 - 5th Avenue North Edmonds, WA 98020 Subject: Geotechnical Review, Revised Deck Location Peterson1montalvo Residence 9323 01yin pie View Drive Edmonds, WA (1-2878 Ref: Report titled, "Critical Area Study, Proposed Deck - Ile (crson/Nlontalvo Residence, 9323 Olympic View Drive, Edmonds, WA.," dated May 6, 2009, by GEO Group Northwest, Inc. Dear Nis, N/lacbLiga: We understand the location of (lie subject wood deck was revised and the deck was constructed 10 feet from the top of the slope, The size of the deck. did not change, based upon out, review of the revised deck plans, the recommendations in the referenced report are still valid, with, no changes to those reconitnendations. It is acceptable for the deck to be sited within the building setback, 10 feet from the top of the slope. Please call if you have any questions. Sincerely, GEO Group Northwest, Inc, Wade J, Lassey Engineering Geologist William Chang, P.E. Principal cc: Mr. Darrin Mock, Cliermak Construction Mr, Strom Peterson, Owner 13240 NE 20th Street, Suite 10 Bellevue, Washington 98005 Phone 425/649-8757 Fax 425/649-8758