Loading...
2012-1136 Girardi's exterior alteration.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 2, 2013 TO: Helgeland, Inc. kyran5000@gmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: 2012-1136 Project: Girardi’s exterior alteration th Project Address: 504 5 Avenue S During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page 2: 1.General Specifications – Codes – Change the WSEC year from ‘2006’ to ‘2009’. 2.General Specifiactions - Structural – Change the code section references from ‘IRC’ to ‘IBC’. 3.Clarify the means to be used to limit the deflection of the #2 2x10 Hem-fir framing members forming the trellis over the windows of the east wall. Consideration should be taken due to the prominent placement of the structure, even if the deflection is within the allowable structural limits. 4.The door arrangement in the ‘Airlock’ does not meet all of the requirements of IBC 1008.1.8. There must be 48 inches of space between the two door in series beyond the width of the door swinging into the space. 5.The ‘Airlock’ door locks/latches must be panic hardware or meet all of the requirements of 1008.1.9.3. 6.Provide a detail of the existing roof framing over the ‘Airlock’. If the rafters are supported by a ridge beam bearing on the header over the two 3.0x6.8 doors, the 2x8 DF may be overspanned. 7.Provide a detail for the attachment of the safety glazed panels enclosing the ‘Existing Deck’ and the ‘Airlock’ that meets the requirements of IBC Chapter 16. When in place, removable panels are required to meet the same requirements as fixed panels.