6 SPECIAL INSPECTION AND TESTING AGRE EMENT
, nr
j f)
Permit
Project:
PHO), to issuance of a Peillift, this form ninso be completed in its entirely and r-eturned to the City for'
appi,ovul. The completed form nuest have signatin-es oi4icknowle(Igment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Fit•ttit acid Special Ins ectors;
The Special Inspection firm of will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
17, Grading/Soils per Table 1704.7 Reinforcement of Concrete per Table 1704.4. 1
Bolting in Concrete per 1704.4.3 Placement of Concrete per Table 1704.4.5-7
Anchors Installed in Concrete per Table 1704.4.4 Fabrication of Structural Steel per Table 1704.3.3
Erection of Structural Steel pci- Table 1704.3.6 n Welding of Structural Steel per Table 1704.3.4-5
All individual inspectors to be employed on this project will be WA130 certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WA BO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm arc qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed, Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
QRkRaw
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
Ile special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
LuAdingleportment*
The building department shall review any revisions and addenda, The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Des in Prof mions"-
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner,
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
Wrnf�, c Mi�
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
I have read and agree to comply with the terms and conditions of this agreement.
4''
I'll A111111
Owner--,", Signature
Date
Date: I"-
Arch./En kd&zSign Date:
0 gl
Special
Special Insp. Agency7
Z 11-121 I-ILI I I 1 `2
ACCEPTEDTOR THE, CITY �O EDMONDS BUILDING DEPT.
By: Date: