Loading...
2013-0090 Mahoney Family Dentistry plbg med-gas.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 11, 2013 TO: Local Plumbing satko@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0090 Project: Mahoney Family Dentistry plumbing/med-gas Project Address: 21727 76thth Avenue W, Suite G During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page 1: 1.General Notes – Note #1 – Provide a listing or approval for the use of ‘Ridgid Pro-Press’ fittings in lieu of brazed fittings for a Level 3 distribution system per NFPA 99 section 5.3.10.9(2). 2.General Notes – Note #2 – Designate the room to be used as the source of compressor intake air that meets the requirements of NFPA 99 section 5.3.3.5.7.1. On page 2: 3.Provide the Waste Anesthetic Gas Disposal (WAGD) system, installed to Level 1 requirements, serving areas where nitrous oxide is intended to be administered per NFPA 99 section 14.3.5.2. 4.Indicate that the anesthetizing locations are required to also meet the requirements of NFPA 99 section 13.4.1, including the ventilation system (per sections 6.4.1 & 6.6.1), and the installation of battery-powered emergency light units. On page 4: 5.Clarify the use of 1-1/2” vent piping after the branch serving the lavoratories in ‘OP5’ and ‘OP6’, the lab sink, and the washing machine join with the branch serving the lounge sink, the dishwasher, the staff restroom lavoratory and waste closet, and the patient restroom waste closet. The maximum unit loading for 1-1/2” vent piping is 8.