Loading...
2013-0264 Rice remodel-addition.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: April 30, 2013 TO: Kristin Hanson hansondesign@hotmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0264 Project: Rice remodel-addition Project Address: 624 Alder Street During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On pages 5 and S-2: 1.Indicate on the plans a callout for hold-downs ‘TD-3’ at each end of the shear wall along gridline ‘2’ as required per pages 23 & 24 of the provided structural calculations. On pages 6 and S-2: 2.Provide a detail and a reference to it on the plans for the means to be used to meet the requirements of Table R302.1. The one-foot overhang along the east side of the structure extends 6-inches into the minimum fire separation distance, requiring 1-hour fire resistance rated construction on the underside of the eaves. The fire resistance rating can be reduced to 0-hours if fire blocking (solid-unvented) is installed from the wall top plate to the underside of the roof sheathing and if no gable vents are installed. As long as the roof ventilation requirements of R806 are met by the remaining openings provided, no additional measures are necessary.