Loading...
2013-0316 Engel's Change of Use.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: April 8, 2013 TO: Jack Perrault Email: Jackperrault@hotmail.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2013-0316 Project: Change of Occupancy th Project Address: 115 5 Ave S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.Please fill out and return the attached Washington State Energy form for Lighting. 2.Is the firebox on the south wall gas or electric? Please provide manufacturer specification sheet and/or listing. 3.Alterations to the space must comply with current building code requirements including the following accessibility features as per IBC 3411.7 (unless technically unfeasible), and shown on the plans: a.Provide an accessible entrance with a 32 inch minimum clear opening, maximum ¾ inch tall threshold and lever style door handle. 3411.8 b.All doors must have lever style door hardware, or equal. IBC 1008.1.9.1 c.Provide a minimum space of 32 inches between the computer table and the opposing countertop. ANSI A117.1 section 403.5 d.Provide maneuvering clearances for the 3 doors at the rear of the space per ANSI A117.1 section 404.2.3. See attached code excerpt. e.Show dimensions for the enlarged restroom, including size of room, dimensions for accessible toilet and sink, clear floor space at toilet and sink, grab bars, etc. See attached restroom tipsheet. ANSI A117.1 chapter 6