Loading...
2013-0400 Swedish Linear Accelerator.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 3, 2013 TO: Scott Rice Collins Woerman Email: Srice@collinswoerman.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2013-0400 Project: Swedish Cancer Center Linac TI th Project Address: 21605 76 Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.Please clarify the water supply connection for the chiller unit. If there is a direct connection, an RPBA will be required for backflow protection. 2.References are made in the structural calculations and on sheet S2.0 regarding the Elekta drawings that contain all of the equipment anchorage and locations. Please provide the appropriate drawings along with signed and stamped engineering calculations for all equipment exceeding 400#, including the gantry/linac, chiller CH-2, and any others. 3.Please provide a copy of the state Department of Health review letter for the project. 4.Special inspections have been called for on this project. Please obtain signatures and return the attached special inspection agreement forms prior to issuance of the permit.