Loading...
2013-0459 Community Health Foundation Structural.pdf May 15, 2013 Leif Bjorback Building Official City of Edmonds th 121 5 Avenue North Edmonds, WA 98020-3145 Subject: Community Health – Partial Foundation (Structural Only Review) Address: 760 Aloha Street, Edmonds, WA 98020 Permit: 2010-0013 Per your request, Beck & Associates has completed a review of the structural only drawings and calculations for conformance with the 2009 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. General 1) The drawings need to clearly identify the scope of this partial foundation permit application. Clearly identify the items that are and are not included. I understand that the scope includes only concrete elements and embedded items. However, this needs to be clearly and explicitly stated in the drawing set and that all steel elements, aside from embedded items, are shown for reference only. General Notes (S1.00-S1.04) 2) Reference the Design Criteria on S1.00. According to the calculations, the dead load nd used for design of the 2 level floor is 28 psf, not 80 psf as specified in the Design Criteria. Please clarify and update either the design or the General Notes as required. 3) Reference the Lateral Forces section on S1.00. The General Notes should identify the lateral force resisting systems utilized for the building: ordinary concentrically braced frames and special reinforced concrete shear walls. 4) Reference the Splice Schedule on S1.01. Specify the concrete compressive strength on which the splice schedule is based. Geotechnical 5) The Riley Group, Inc. recommends that the project plans and specifications be submitted to them for a general review to confirm that the recommendations in geotechnical engineering report have been interpreted an implemented properly in the construction documents. The Riley Group should provide a letter of review indicating Permit 2013-0459 May 15, 2013 Page 2 of 3 that their recommendations have substantially been incorporated into the project plans and specifications. Where corrections or additional recommendations are required based on the geotechnical review, those corrections and recommendations need to be incorporated into the plans and specifications prior to re-submittal of the plans for our review. Lateral 6) It appears that the design of the lateral force resisting system will need to consider a redundancy factor, rho, of 1.3. Provide an analysis for determination of rho in each direction. Revise the lateral design as determined by the analysis. ASCE 7-05, Section 12.3.4.2 7) Collector elements, splices, and their connections to lateral force resisting elements are required to resist load combinations considering overstrength. Overstrength for ordinary braced frames is 2.0. It is unclear from the calculations if overstrength was considered in the design of the collectors and their connections. Please review these conditions, revise the analysis or clarify to clearly show where overstrength has been applied in the analysis. ASCE 7-05, Section 12.10.2 S2.01Fa – Partial Foundation Plan 8) Provide a section cut and detailing for the concrete wall condition along grid B.5. The detail should illustrate that the wall will retain soil. 9) Specify the width of the shear wall footing located along grid 5. According to the calculations it is required to be 8’-0” wide. S2.01Ga – Grade Level Framing Plan 10) Section 3/S3.10 and 4/S3.10 are cut on the plans. However, the details indicate that that they are for “Reference Only.” Additionally, the detail references appear to be incorrect. 11) It appears that section 1/S3.02 should be called out at the concrete shear wall located along gird 5. S2.02a – Floor Framing Plan 12) The plans reference details on S3.20. However, this sheet was not included in the submitted plan set. Please coordinate. 13) Detail 5/S3.12 is called out at grids B.5 and 1.5. It appears that the reference should be to detail 5/S3.15. Please coordinate. S3.01 – Foundation Details 14) Reference detail 4/S3.01, Typical Concrete Column at Spread Footing. Transverse reinforcement is required to comply with Section 21.13 of ACI 318-08. The engineer should provide calculations to demonstrate that adequate transverse reinforcement is provided in the concrete columns. ACI 318-08, Section 21.13 S3.30 – Concrete Wall Elevations 15) Reference 1/S3.30. Permit 2013-0459 May 15, 2013 Page 3 of 3 a) According to the calculations (4) #9 are required to span horizontally from grid A.2 to grid B. These are not specified. b) The design of the concrete wall is based on tank design principles. However, there is no wall framing perpendicular to the wall along grid B. Please review this condition and revise the design as required by the conditions. 16) Reference 7/S3.30 – Schedule a) According to the calculations, Mark A-1 is required to specify #7 @ 12” o.c. EF. Currently, the schedule implies that the #7@12” o.c. is centered. b) According to the calculations, Mark A-3 is required to specify #7 @ 12” o.c. EF. Currently, the schedule implies that the #7@12” o.c. is centered. Please contact me should you have any questions or require clarification on any of the items contained in this letter. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC