Loading...
2013-0467 Lo remodel-addition2.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 12, 2013 TO: Thomas Lo tctl2270@hotmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0467 Project: Lo remodel-addition th Project Address: 23910 80 Way W During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Items that recur on this list appear in italics. Thank you. On pages 4 and 5: 1.Clarify the callout for the HDU5/SDS2.5 holdowns at each end of the braced walls along the ‘Lower Left’ braced wall line. Per the manufacturer the holdowns are unable to meet the tension loads noted on page 8 of the provided structural calculations at those locations. The response stated that DF studs were called out on the plans, yet no reference to DF studs could be found at the holdown callout on page 4, in the referenced detail ‘5/S2’, in the ‘General Structural Notes’ on page 7, or in the ‘Framing Lumber’ notes, ‘Shearwall Notes’, or ‘Holdown Notes’ on page S-1.0. 2.Clarify the callout for the HDU2/SDS2.5 holdowns at each end of the braced walls along the north-south ‘Lower Interior’ braced wall line. Per the manufacturer the holdowns are unable to meet the tension loads noted on page 9 of the provided structural calculations at those locations. I typed the wrong page on the earlier comment letter.