20130521163342713.pdfi "ty, of Ecfir"r',iorids
1"'raffic LIT 1pact Ar"ilalysis VVI(,)i� l<si-",I�ee'l'I
Name of Proposed Project:
Owner/Applicant
Name
c 5 G
Street/Mailing Address
C. . ......
City
State
Zip
Telephone:
011,111. fril : I
vy
Applicant Contact Pei -son:
Name
Street/Mailing Address
City State Zip
Telephone:
Firm Name Contact Name
Telephone: E-mail:
THRESHOLD LEVELS OF ANALYSIS
_Fr_0ie_r_t Traffic Levels T.-Sections to Complete
1. Less than 25 peak -hour trips generated I and 7 only (Worksbeet/Cliecklist)
11. More than 25 peak -hour trips generated All sections
I. PROJECT DESCRIPTION
a. Location -Street
t address:
Attach a vicinity map and site plan.)
b, Specify existing land use:
c. Specify proposed type and size of development:
of resldentia l units andlor squarefibotage ol'building)
Revisedon 6124/10 E82 - Trq/ /k- linpad AactlysksIf'ork.% heel Page 1 ql'5
d. Date construction will begin and be completed: WINt,06V6Y �kV .. 01 � ssr
e. Define proposed access locations:
) ye mpg 9 � C y
f. Define proposed sight distance at site egress locations:
2. TRIP GENERATION
Source shall be the Eighth Edition of the .Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
Land Use Daily (ADT)
PM Peak -Hour Trips
IN
OUT
b. Proposed Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
c. Net New Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page 2 of 5
7. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic
impact fee shall be calculated from the Ednionds Road Impact Fee Rate Study Table 4 (attached)
and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations
in E"CDC 18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If the
previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04),
the 2004 ECDC 18.82.,120 irnpact fee shall be used.
ITE Land Use Category
Per Unit
Fee Rate
INFUse
ew..
offi C"i",
$ '3'
Pric)r se
-
' ',
Units in
square feet,
# of dwelling,
of , etc,
X-
x
New Use.Fee: $ Prior Use Fee:
11 NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
--- ------- -- - vl]p, etc.
New Use $ X I
Ll OTHER
Engineering Division Approval
Fee
$
c"'j
LIM
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a. net, negative.
Revisedon 0124110 Ps'{' 2 - D-qf fic Impacl Anafysis fforksheel fjage5 c?f 5