Loading...
20130523164009555.pdf-L Li k- is b,q fry, City of Edmonds Al Traffic Impact Analysis Worksheet Name of Proposed Project: ANTHONY'S EDMONDS Owner/Applicant ANTHONY'S RESTAURANTS Name 10502 NE 37TH CIRCLE BLDG 7 Street/Mailing Address KIRKLAND WA 98033 Applicant Contact Person.: CHRIS EGNATZ Name 1110 112TH AVENUE NE SUITE 500 Street/Mailing Address BELLEVUE WA 98004 City State Zip City Telephone: 425.455.0732 Telephone: 425.463.1279 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name THRESHOLDTelephone: E-inall: LEVELS OF ANALYSIS State Zip Project Traffic Levels Sections to Com Tete _ I. Less than 25 peak --hour trips generated 1 and 7 only (Worksheet/Checklist) II. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location -Street address: 456 ADMIRAL WAY EDMONDS WA. 98020 (Attach a vicinity map and site plan.) b. Specify existing land use: THE EXISTING BUILDING WAS PREVIOSL..Y USED ASA MIXED KITCHEN, STORAGE, AND BANQUET FACILITY CLASSIFIED AS (710 GENERAL OFFICE). c. Specify proposed type and size of development: SEE WRITE UP BELOW: Revised on 6/24/10 E82 -Traffic Impact Analysis Worksheet Page 1 of 5 d. Date construction will begin and be completed: JUNE 2013 - OCTOBER 2013 e. Define proposed access locations: ACCESS LOCATION SHALL BE THROUGH EXISTING DRIVE AISLES AND PARKING ADJACENT TO ADMIRAL WAY. f. Define proposed sight distance at site egress locations: EXISTING SITE DISTANCES ARE ARE GREATER THAN A 114 MILE ON ADMIRAL WAY. C. THIS IS A RENOVATION OF A 3206 SQFT SPACE ADJACENT TO THE EXISTING ANTHONY'S BEACH CAFE. THE RENOVATION INCLUDES THE EXPANSION OF THE BEACH CAFE'S FOOD PREP. AND A PROPOSED STORAGE 1 BANQUET AREA WHICH WILL MIMC THE THE USE OF THE PREVIOUS YACHT CLUB. IT WAS DETERMINED THAT THESE USES WILL BE CONSIDERED A LIKE FO LIKE AND NOT INCREASE THE TRAFFIC GENERATED ON THE SITE. IN ADDITION, THERE WILL BE 471 SF OF RENOVATED SEATING AREA WITHIN THE PROPOSED EXPANSION. IT WAS DETERMINED THAT THIS CHANGE IN USE WILL AFFECT THE TRAFFIC GENERATED ON SITE AND REQUIRE AN IMPACT FEE BASED ON THE ATTACHED CALCULATION. 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edinonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. F� CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09112104), the 2004 ECDC 18.82.120 impact fee shall be used. Fee New Use Fee:$ 2213.70 Prior Use Fee: $ 852.51 NEW DEVELOPMENT ITE Land Use Category New Use ❑ OTHER Per Unit Fee Rate $ �X Units in square feet, # of dwelling, vfz). etc. MITIGATION FEE RECOMMENDATION: 0 INDEPENDENT FEE CALCULATION: $200.00 + consultant fee Units in TOTAL TRAFFIC IMPACT FEE ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, X X vfp, etc. 471 471 New Use 832 RESTAURANT $ 4.70 Prior Use 710 GENERAL OFFICE $ 1.81 Fee New Use Fee:$ 2213.70 Prior Use Fee: $ 852.51 NEW DEVELOPMENT ITE Land Use Category New Use ❑ OTHER Per Unit Fee Rate $ �X Units in square feet, # of dwelling, vfz). etc. MITIGATION FEE RECOMMENDATION: 0 INDEPENDENT FEE CALCULATION: $200.00 + consultant fee $ 0 TOTAL TRAFFIC IMPACT FEE $ 1301.19 City of E monds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative, Revised on 0'/24110 E82 - Trofic Impact Ana1)wis Worksheet Page 5 of 5