2013-0599 Purser SFR.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 3, 2013 TO: Robert Purser rob.purser@gmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0599 Project: Purser SFR Project Address: 922 Cedar Street During a review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page A3: 1.Clarify the callout for the 36x36x8 isolated footing used to support the east end of ‘Beam GB-4’ – 5-1/8x19-1/2 24F-V4 GLB and the west end of ‘Beam GB-5’ – 5-1/8x19-1/2 24F- V4 GLB where they converge over the center of the garage. It appears to be undersized for the load noted in the provided structural calculations. 2.Clarify the callout for the 36x36x8 footings used to support each end of ‘Beam GB-4 OPTIONAL SINGLE SPAN’ – 10-3/4x24 24F-V4 GLB. They appear to be undersized for the loads noted in the provided structural calculations. Note: Using the 25.5 foot span (measured from the center of the supporting columns) the point load on the beam is at 15.5 feet, slightly changing the distribution of the loads at each end. 3.Indicate on the plans the required footing to support the east end of ‘Beam GB-6’ – 5-1/8x12 24F-V4 GLB and the west end of ‘Beam GB-7’ – 5-1/8x12 24F-V4 GLB where they converge over the front of the garage. It appears to be undersized for the loads noted in the provided structural calculations. On page A4: 4.Indicate on the plans the required beam to support the load over the 6.0x5.0 window in the south wall at the base of the stairs. The 4x10 DF#2 noted as typical appears to be over spanned due to the point load from the south end of ‘Beam BB-2’ – (3) 2x12 DF#2. On page A5: 5.Clarify the length of wall bracing shown along the north wall of the Dining Room – upper level braced wall line ‘B’. The placement of the holdowns and the construction of the walls will not result in the 6 foot of wall bracing noted in the provided structural calculations. Page 2 of 2