Loading...
20130717162605919.pdf.... ... . ..... . .. . .... . . ......... . .. .... . . ...... . ....... . .... ..... ........ . .... .. "'ity of "I 11E, d tn r�i d s, Tri affi(:� Irnpact Ire 'ialysis Wot­ksheetl lie, Name of Proposed Project: 14&Ant-,TOr-' c_"Oto1'AAC.TC. Owner/Applicant K/AARE14 C014,D10146 4,Lc- /Koss qav5cev Name i r6 s'T A,4 E s s' TE. 2 o Street/Mailing Address SEA-rr"e wA q6I 3'Y RM State Zip Telephone: fq?_Ir) _X`716 - Y7,110 Applicant Contact Person: VVM??AC-H?4F. FACIHel'I" J H0ARr_HvTECTS Name CZ07 LA-hE WASH Street/Mailing Address '&cvo me", '$'v, -re Zoo V� VQ., KA D wA q b o 21� City State Zip Telephone: (qtr) qzg - Zi00 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): 1111"2 M, Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: MEMO I N XA�IIN 011 � 174 Irest Traffic Levels sectionLto Coi2L)!ete 2L 1. Less7h_ZIYjjaTTiour _77U-7 only (Worksheet/C"'hecklist) 11, �orcihan25_1; WK�hotit7i� sgenerated All sections 1, PROJUCT DESCREPTION a. Location .-Street address: Kv E _k' Slu"I w-,) r-`MGP4051.1qA 1602(y (Attach a vicinity inap and site plan.) b, Specify existing land use:-,, tAEDicAL'_/ �.o'ke"S!s c, Specify proposed type and size of development: MEU(rAIIII,_,_Z' 16t,kArt 'OZ(o SA ___ (# q residential units andlor sqnarefoofage of building) Revised on 6121110 E82 .. Traffic bipact Analysis Worksheet Page I qJ'5 d. Date construction will begin and be completed: r� e. Define proposed access locations --7 o l AND f817-1 X71' SO OcA ('17 int f. Define proposed sight distance at site egress locations: 2. TRIP GENERATION Source shall be the Eighth Edition of the institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) � OUT b. Proposed Project Trip Generation Table: PMPeak-Hour'S"r��s�w����������w�w�w Land Use Daily (ADT) 0tJ'�`I'l""I'll""w'll""I'll""I'll",'ll""I c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT)������ �.........m.�� C.ti.l'I" d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 612,1//0 E82 - Trafc Impact Analysis /i"orksheel Pagan 2 of 5 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. For developments that generate over 75 peals -hour trips, the City Engineer reserves the right to require trip distribution to be determined through use of the City traffic model. 1 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO requirements? b. Intersection Level of Service (LOS) Analysis: Intersections to be evaluated shall be determined by the City of Edmonds Ti•affic Engineer Existing Conditions LOS Delays Year of Opening LOS Delays Five Years Beyond Change of LOS Delays Land Use c. Describe channelization warrants: (Attach striphig plan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing lengths): 50% 1 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants): f. Summarize local accident histotyz (only required for access to principal and minor arterials): t Available upon request at City of Edmonds Development Services Department 2 Available upon request at City of Edmonds Police Department Revised on 6124110 E82 - Rafc hnpact.4nalysis If'orksheet Page 3 of 5 TRAFFIC VOLUMES Provide the following and other planned development traffic within the city. a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour coverts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE (IAS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments' must also be factored into the LOS calculations. b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Traffic Impact Analysis H'orksheet Page 4 of 5 LOS LOS Existing Conditions Existing Delays Year of Opening With Project Without Project Five Years Beyond Change of Land Use With Project Without Project b. Note any assumptions/variations to standard analysis default values and justifications: 1 A list of planned developments are available at the City upon request for public records Revised on 6/24/10 E82 - Traffic Impact Analysis H'orksheet Page 4 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130, LJ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Fee'Rate # of dwelling, vfy etc. New Use $ X Prior Ifse $ X . .... . ........... . . .. . . .......... . .. New ts Fee: - JeFe [ JPriot.UseFee : raa Kw -1O ., 'Fa M�, Units in ITE Land Use Category Per Unit Fee Rate square feet, # of dwelling, Fee of etc. =Newse X $ ... . ..... .... City of Edmonds, Engineering Division Approval Date 'No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124/10 E82 - Traffic Impact Analysis IYorksheel Page 5 of 5