2013-0723 Herrick remodel-addition2.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 30, 2013 TO: Randall J. Munson randy.munson@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0723 Project: Herrick remodel-addition st Project Address: 6804 161 Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ changes can be found on the plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Items that recur on this list appear in italics. General note: The unique and specific nature of the work necessary to complete your project requires · special inspection per IBC 1704. A City of Edmonds ‘Special Inspection and Testing Agreement’ (see attached) for the following work will need to be completed and returned prior to permit issuance. Pipe Piles o Welding o A completed City of Edmonds ‘Special Inspection and Testing Agreement’ could not be found among the resubmitted documents. It is not required for plan review approval, but must be completed and returned prior to permit issuance. On page A-9: 1.Soil note – Clarify the reference to geotechnical report #JN 12231, completed by Geotech Consultants, Inc. and also referenced in the ‘Pipe Pile Foundation’ notes. No report could be found among the submitted construction permit application documents. No report could be found among the resubmitted construction permit documents. 2.Pipe Pile Foundation notes – Clarify the difference in the required dimensions of the 4” diameter pipe pile top plates and those noted in details 1, 5, 6, 7, and 8. No response to this review comment could be found among the resubmitted construction permit documents. 3.Pipe Pile Foundation notes – Indicate on the plans the required pipe pile installation criteria to guide proper construction and inspection. No response to this review comment could be found among the resubmitted construction permit documents. Other construction permit documents: 4.Structural Calculations for Lateral and Pipe Piles – Provide/update calculations that reference the applicable sections/formulas of and meet the requirements of the 2012 International Building Code (IBC). The resubmitted structural calculations still reference the 2009 IBC, the 2001 National Design Specifications (NDS), and related requirements. Page 2 of 2