2013-0723 Herrick remodel-addition2.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: October 30, 2013
TO: Randall J. Munson
randy.munson@comcast.net
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2013-0723
Project: Herrick remodel-addition
st
Project Address: 6804 161 Street SW
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded changes can be found on the plans, have been submitted to a Permit Coordinator.
Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional
comments. Items that recur on this list appear in italics.
General note:
The unique and specific nature of the work necessary to complete your project requires
·
special inspection per IBC 1704. A City of Edmonds Special Inspection and Testing
Agreement (see attached) for the following work will need to be completed and returned
prior to permit issuance.
Pipe Piles
o
Welding
o
A completed City of Edmonds Special Inspection and Testing Agreement could not be found
among the resubmitted documents. It is not required for plan review approval, but must be
completed and returned prior to permit issuance.
On page A-9:
1.Soil note Clarify the reference to geotechnical report #JN 12231, completed by Geotech
Consultants, Inc. and also referenced in the Pipe Pile Foundation notes. No report could
be found among the submitted construction permit application documents. No report could
be found among the resubmitted construction permit documents.
2.Pipe Pile Foundation notes Clarify the difference in the required dimensions of the 4
diameter pipe pile top plates and those noted in details 1, 5, 6, 7, and 8. No response to this
review comment could be found among the resubmitted construction permit documents.
3.Pipe Pile Foundation notes Indicate on the plans the required pipe pile installation
criteria to guide proper construction and inspection. No response to this review comment
could be found among the resubmitted construction permit documents.
Other construction permit documents:
4.Structural Calculations for Lateral and Pipe Piles Provide/update calculations that
reference the applicable sections/formulas of and meet the requirements of the 2012
International Building Code (IBC). The resubmitted structural calculations still reference
the 2009 IBC, the 2001 National Design Specifications (NDS), and related requirements.
Page 2 of 2