Loading...
2013-0869 Murphy remodel-addition.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 5, 2013 TO: Randall J. Munson randy.munson@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0869 Project: Murphy remodel-addition rd Project Address: 121 3 Avenue N During a review of the plans for the above noted project, it was found that the following information, clarifications, or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page A-3 or A-4: 1.Indicate on the plans the location of the furnace and the water heater. 2.Indicate on the plans the means to be used to provide the required whole-house mechanical ventilation per M1507.3. On page A-5: 3.Foundation Plan – Indicate on the plans the required size of the isolated footing below the south end of ‘Beam No. 1’ to avoid ‘scaling’ and to guide proper construction and inspection.