2013-0899 Murphy garage.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 5, 2013 TO: Randall J. Munson randy.munson@comcast.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-0899 Project: Murphy garage rd Project Address: 121 3 Avenue N During a review of the plans for the above noted project, it was found that the following information, clarifications, or changes are needed. Please provide written responses as to where the changes can be found on the plans, cloud all changes on the revised plans, and submit the revised plans/documents to a Permit Coordinator. Thank you. On page A-8: 1.Detail 1 – Portal Frame with Hold-downs IRC R602.10.3.3 – Indicate on the plans the required footing/foundation below the ‘Method PFH – Portal Frame with Hold-downs’ per Figure R602.10.6.2 of the 2012 IRC (effective July 1, 2013) - Washington Administrative Code (WAC) 51-51/ Edmonds Community Development Code (ECDC) 19.05.000. 2.Floor/Foundation Plan - Indicate on the plans the required footing/foundation below the ‘Method PFH – Portal Frame with Hold-downs’ per Figure R602.10.6.2 of the 2012 IRC (effective July 1, 2013) - Washington Administrative Code (WAC) 51-51/ Edmonds Community Development Code (ECDC) 19.05.000. 3.Floor/Foundation Plan – Indicate on the plans the required 1800 pound hold-down at the east end of the south ‘BWP’ per R602.10.2.2.1.2. – (Since the ‘T-1’hold-downs are cast-in- place, those noted on the ‘Roof Framing Plan’ should be shown on the ‘Floor/Foundation Plan’ to guide proper construction) 4.Roof Framing Plan – Clarify the callout for ‘T-1’ hold-downs – STHD10/10RJ – to be used at each end of the braced wall panels of the ‘Portal Frame with Hold-downs’. Per the manufacturer they do not meet the load requirements of Figure R602.10.6.2. * With the adoption of the 2012 IRC, The ‘Portal Frame with Hold Downs for Engineered Applications’ (APA – The Engineered Wood Association publication TT-100E December 2012) may be of use as an alternative to the IRC Figure R602.10.6.2 ‘Method PFH: Portal Frame with Hold-downs’. It allows for a 3500 pound strap-type embedded hold-down as opposed to the 4200 pound strap required by the IRC, reflecting the stated capacity for such items produced by the various framing connector manufacturers. All other elements of the two designs are the same. * 5.Roof Framing Plan – Clarify the callout for ‘Beam No. 1’ – 3-1/2x11-7/8 2.0E PSL. It appears to be over spanned and deflects beyond that allowed per Table R301.7.