2013-0904 Lewis Addition.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: September 23, 2013
TO: Jay Lewis
Email: jaylewis32@gmail.com
FROM: Leif Bjorback, Building Official
RE: Plan Check: 2013-0904
Project: Lewis Residence Addition
th
Project Address: 1126 8 Ave S
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a permit coordinator in the
Development Services Department. Thank you.
1.Structural plan sheets S2.1 and S2.2 need to be signed by the appropriate design
professional.
2.Exhaust fans with a minimum of 50 cfm are required in each of the bathrooms and toilet
room. If you wish, this is an item that I can redline on the plan.
3.Please identify on the plan the girder over the gym that carries the cantilevered deck joists. In
the structural calculations it appears this may be the Beam Supporting Deck Framing.
Please show the distance of the backspan on the plan. The calcs show a backspan of 8 feet
but on the plan this scales to approximately 4.5 feet.
4.Please provide structural calculations for the 3-1/8x9 glulam and the 2x8 joists at the
entry.
5.Specify on the plans the size and type of anchor bolts for the HTT4s and HTT5s.