Plan review number 01.
'rask Number 13-03
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the Fire Suppression requirements of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
Please note the Piping plan is very hard to read. Please increase the scalle in order to read
all the information's when resubmitting.
Page 2 of 2
Plan Review Number 01.
EECE#: EDM 13-03
McDonalds
BLD2013-0948
Fite Suppression Comments
General
1. Please submit analysis for the Sammy screws to resist the design loads. ASCE
13.6.8.3 NFPA 9.3.5.9 NFPA 9.3.5.12.1
2. The general notes state the owner is responsible to assure the structure will support
the sprinkler system. Please submit analysis to justify the sprinkler system will be
able to be supported as detailed and the existing member are able to transfer the
design loads.
Sheet FP 1
3. It is not clear the locations your seismic bracing as require per code. Please
modify the drawing to clearly show the locations of all bracing. NFPA 9.3.5 ASCE
13.3
4. Provide pressure gauges on the riser both above and below the control/check
valve. NFPA 13, 7.1.1.2
5. Provide a longitudinal brace within 40 feet of the end of the main. NFPA 13,
9.3.5.4.3
6. Detail - Riser Diagram: Show an automatic drip valve on the fire department
connection detail. NFPA 13, 8.17.2.6
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (206) 356-