PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: September 10, 2013
TO: Graham Travis/GT Residential
graham@gtcontracting.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2013-0936
Project: Alsdorf deck
th
Project Address: 670 13 Way SW
During a review of the plans for the above noted project, it was found that the following
information, clarifications, or changes are needed. Please provide written responses as to where the
changes can be found on the plans, cloud all changes on the revised plans, and submit the revised
plans/documents to a Permit Coordinator. Thank you.
On page A-100:
1.Detail #2 Framing Plan Clarify the callout for the 4x8 HF #2 beams to be used to support
the joists at the south end of the upper deck and along the same line below the joists of the
lower deck. They appear to be over spanned, fail in bending and deflect beyond that
allowed per Table R301.7.
2.Detail #2 Framing Plan Clarify the callout for the 8 diameter concrete post pier footings
to be used to support the point loads at the ends of the beams. Using the assumed soil
bearing pressure of 1500 PSF, their capacity is 523.33 pounds each, well below that required
for all except two of the locations shown see also review note #4.
3.Detail #2 Framing Plan Indicate on the plans the required 10 on-center stair stringer
spacing for the support of the TimberTech decking material per the manufacturer see also
review note #6.
4.Detail #3 Typ. Ledger Detail Indicate on the plans the required on-center spacing of the
fasteners to be used to fasten the ledger to the existing structure.
5.Detail #4 Typ. Post Footing - Clarify the callout for the 8 diameter concrete post pier
footings to be used to support the point loads at the ends of the beams. Using the assumed
soil bearing pressure of 1500 PSF, their capacity is 523.33 pounds each, well below that
required for all except two of the locations shown see also review note #2.
6.Detail #5 Typ. Stair/Handrail - Indicate on the plans the required 10 on-center stair
stringer spacing for the support of the TimberTech decking material per the manufacturer
see also review note #3.
7.Detail #5 Typ. Stair/Handrail Indicate on the plans the required handrail per R311.7.8.
The 2x4 cedar top rail does not meet the grip-size requirements of R311.7.8.3.
8.Detail #5 Typ. Stair/Handrail Indicate on the plans the required stair riser construction