Loading...
2013-1052 Chung addition-deck revision.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: December 20, 2013 TO: Design Works Construction, Inc. mick@designworksconstruction.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-1052 Project: Chung addition/deck revision th Project Address: 8519 204 Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On page A2: 1.Foundation Plan – Clarify the callout for the holdowns ‘T-1’ – STHD14RJ – to be used at each end of the relocated ‘SW-1’ braced wall on the north side of the ‘Family Room’. The foundation appeared to be in place, having been inspected and approved on 11-15-2013 without the holdowns at the locations shown, hindering the use of cast-in-place holdowns. A post-installed-type of anchorage, specified and installed to meet criteria required by the engineer of record, might be a viable solution.