Loading...
20131120115131959.pdfI I—Lold, ID 61 fr 44 cp cp* ID Lj" a ju A9 i -Z th Co 10 I—Lold, ID 61 fr 44 3 a / (1y �.., vq j .s rN m 3 b° t 0 3 a / (1y �.., vq a .s � o � F A s v ro cr a UPnr-_ R cxrco SYSTEM CROSS SECTION SEE PAGE 3 FOR OUTLET CONTROL DETAIL x` (D" DWMP4'116" SPALLS (OIL=*^J DEEP, cAuSur=p pocn F 9,70 IMA CONTROL 101011012 PAGE I OF 2 � for lncatinn plan by phone date' System lmperm Pipe Pipe Orifice DOW 1. Call Engineering Division (771-3202) for prpbackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the resnnnsihiiity of the property owner(s). Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times.