Loading...
20131125111235041.pdfo� so,�r °� SPECIAL INSPECTION AND TESTING AGRE EMENT V N Permit #: l Project: Prior to issuance of rG pei mit, this foi-m inust he completed in its entirety rarart reframed to the City for• upprovuL The completed form must have signutures of acknowleflgnient by call parties. DUTIES AND RB SPONSIBILITU1,S Special Inspection Firm and Special Inspectors: r The Special Inspection firm of ��i Pl�� , f e ° will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masonry ❑ Structural Steel/Welding ❑ High Strength Bolting ❑ Spray applied fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation by design professional ❑ Grading/soils a Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WA 30 certified, a detailed resume of the inspector and film must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. t The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the -City. hispection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution, A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued, This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and apruue> iosaddenda. Any unresolved discrepancies must be detailed in the final report. U � OCT 12 2012 BUILDING DEPAR.MENI' CITY OF EDMO DS LRBuilding New Polder 2010\Forms\Special inspection rorm.doc4/30/2012 t 3 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection, The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector.. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector, Buildina Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans, The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Desian Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required, and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. / _ Owner: ��� Signature Date _;x ✓` Contractor: 511W OLS &U) Signature. Date: Arch./Eng: Signature Date: Special Insp, Special Insp. Agency Signature ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT. Date: LABuilding New Folder 2010Torms\Special inspection form.doc,1/30/2012 Date: Contractor: The contractor shall provide the special .inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector.. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to- schedule regular inspections. No concrete shall be poured or other work covered until approval i$ given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly-digate on the plans and specifications the specific types of special inspection required, and shall include a schedTsle for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions'beingperformed in the field. Owner: { The project owner, or the architect or engineer,acting as the owners agent, shall employ the special inspector or agency- '_ -�—. ---------- A failure of the special inspector or firm to perform in Iceeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case anew special inspector and/or firm would need to be proposed for approval. A. failure of the design and/or construction parties to perform iA accordance with this agreement may result in a STOP WORD notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms ;and conditions of thus agreement. Owner: Signature Date Contractor: Signature Date: Arch./Eng: i Signature Date: lr� Speciallnsp. Special Insp. Agency ACCEPTEDF THE CITY OF EDMONDS BUILDING DEPT. By Date' ` —1^1 L.Building Nt!w FoTder 2010\Fornts' Speci,ii inspection form.doc4/3012012 BLD2012-0265 REQUIRED SPECIAL INSPECTIONS-- ® SOIL CUTS ® TEMPORARY ECO -BLOCK SHORING ® FOUNDATION SUB -GRADE VERIFICATION RETAINING WALL/ROCKERY PLACEMENT ® PLACEMENT OF FILL AND COMPACTION (INCLUDING SWIlV POOL) e SUBSURFACE DRAINAGE INSTALLATION ® TEMPORARY AND PERMANENT EROSION CONTROL m INFILTRATION SYSTEM y cl cl ca