DATE: October 25, 2013
TO: Erik Nelson
enelson@lynnwoodhonda.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2013-1129
Project: Nelson hot tub
Project Address: 723 Hanna Park Road
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
‘clouded’ changes can be found on the plans, have been submitted to a Permit Coordinator.
Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional
comments.
General Note:
1.Indicate on the plans the plumbing and mechanical systems to be installed to support the
operation of the hot tub and the details of their installation. Of specific concern are
connections to the potable water supply for filling and any required backflow protection per
UPC chapter 6, connection to the sanitary system for drainage per ECDC 18.10.050/ UPC
chapter 7, installation of a heater and gas piping to provide fuel per IFGC chapters 3 & 4.
Include details regarding piping materials, sizing, placement (underground or surface),
protection, etc.
2.Indicate on the plans the means to be used to meet the barrier requirements of section
AG105 in Appendix G of the International Residential Code (IRC).