Loading...
2013-1129 Nelson hot tub.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 25, 2013 TO: Erik Nelson enelson@lynnwoodhonda.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2013-1129 Project: Nelson hot tub Project Address: 723 Hanna Park Road During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ changes can be found on the plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Note: 1.Indicate on the plans the plumbing and mechanical systems to be installed to support the operation of the hot tub and the details of their installation. Of specific concern are connections to the potable water supply for filling and any required backflow protection per UPC chapter 6, connection to the sanitary system for drainage per ECDC 18.10.050/ UPC chapter 7, installation of a heater and gas piping to provide fuel per IFGC chapters 3 & 4. Include details regarding piping materials, sizing, placement (underground or surface), protection, etc. 2.Indicate on the plans the means to be used to meet the barrier requirements of section AG105 in Appendix G of the International Residential Code (IRC).