20140205155859428.pdfAugust 2, 2012 TGG Project #155-4 City of Edmonds Development Services 121 5th Avenue North Edmonds, WA 98020 Subject: Final Drainage Letter 870 Northstream Lane Edmonds, Washington BLD 20110059 Attention: Jennifer Lambert The Galli Group monitored the installation of the drainage system for the above referenced project and permit number. The improvements consisted of a catch basin directing stormwater runoff from the bridge and aprons to a dispersion trench. The installation of the collection and dispersion system was in general conformance with our recommendations and the approved plans. One minor variation from our original submittal had to do with the surface mounted drains from the abutment subdrains shown on the plans. The Corps of Engineers would not allow direct discharge to the stream, so the backwall drains from the modular abutments were eliminated with our approval. Because the aprons are covered, the site soils are relatively granular, the abutments allow water to pass through the modular units, and there was no evidence of seepage all led us to conclude that the drains would not be necessary. In addition a high quality free -draining backfill was used behind the abutment walls. The site appeared well on its way to final stabilization from established vegetation as of our last site visit. Sincerely, THE GALLI GROUP 110 Paul L. Stoltenberg, P.E. Project Geotechnical Engineer ?012 5034 — 18t" Avenue NE, Seattle, WA 98105 Phone: 206.525.5097 Fax: 206.525.5091