Loading...
SPECIAL INSP AGREEMENT.pdfSPECIAL INSP1 ION AND TESTING AGREEMENT BLID 2013-1338 Petty It Jaqobsen,s Marline Project: Prior to issmince, qf it Permit, 11jjSjbjljj 11111sl be completed M its elitire1y find returijett 10 1he Cilyfol' (II)ppowd. The completedfarm signailres of ackiiowletIgmierrt b)} WIM"Wes- DUTIF S AND USPONSIBILITIES 1212—C 1 in "Orl-irm"i-q The Special Inspection firm of Otto Rosenau and Associates, Inc. will perform special illspectial) fol, tile Following, e mare than 0110 fil-111 is to be .v .nis njust (lesubmitt d if m r gapes of work (separate ro employed): " Soil compaction/Bearilil" Alt individual inspectors to be employed on this plqject will be WABO certified for the type ol"work flicYal-a to inspect. If inspection is for work that is not covered by the WABO categories, 01- tile inspector is 'lot WABO col-tirled, ki detailed resume of tile inspector and J-wni inust be submitted. The resuille InUst sIlOw dint the in,qpectol, and the firin are qualified by education Ind experience to PerFOrM the work and testing required by the project design and specifications, Tile work shall be inspected for willi the pfims and specifications RI)PI-OMI bY 1110 City, Revisions and addenda sheets will not be, Used fol• inspection, sinless they leave beets approved by tile City. Inspection records sliall includc: A daily record to be maintained 01) site, itemizing the inspections performed. Any nonconlo"i'liflu work sliall be bi,ouglit to the immediate attention Dfilie contractor A weekly report shall be submitted to the City, detailing the inspections and testing performed, listing ally ilonconforming work and resolution of ilon coil fol,in Ing items. I n A sheetI-eport sliall be submitted to site building depailmeot prior (0 the Certificate OfOccill a cy being issued. 'I'liis report will indicate that inspection and testing was completed in conformance wide the approved pilins, qpocificatiolis and npproved revisions or nddcrida. Any utjj�asolved discrepancies insult. be detailed in the final "W"L 92) hilt til—e lto i � The contractor sliall provide the special inspector or agency adequate notificstioll of Work requiring inspection. Tlie, Cioj approved plait and specii`icatiollS InLiSt be made available, at tliejobsite For the Use Of tile SpeCilfl ilisl3ec(ol. and tile City inspector. The contractor shall insintain all daily inspection reports, Oil site, For review by all parlics. 'I'lle special inspection r1loctions are considered to be in addition to the 1101-illal itispectioiLq perfonned by the City and tile Contractor is respollsibic 1,01. co(Ijactilig the City to scliedule regulm- inspections. No concrete sliall be I)QUred or salter wol-k covered Until approval is given by the tit' inspector. �Ilnfl C(N� doVAIM0 1,1 gif hindums �:IfLnJI111wil by jjjqjm!i?3 TId Icsting i1gree hu,LWiag D.� m� i K Ln —,�- A At -f n The building department shall revic�,v ally revisions and addeada, The City insPectol' will 1 10 it0V the Vcci I inspection functions for Compliance 'fire City irispfctor shall be with tile ae ,ree"lont anri tile approved plans. responsible for approvinbl various stal3es of consirnetion to be covered and ror work to promd. p Lsi L, Li 1 s (1fa Li Is, $of special Tile architoct and/or engincerWill clearly indicale on the plans and specifications tile Specific Wile inspection required and shall inckido .1 scileclulo for inspection and testing, The architect and/or engineer will coordinate their revision and addenda process in such a wily as to ensure that all required City appmals are ob4iined, prior to work shown oil the revisions being; perfi)tmed in the field, P-in—len. ,rlln project owner, or tile, archit"'t or engineer acting as tile owners agent, Shall orliploy the special inspector or ngency. ENFORCEMENT or Cirm to peribrin ill keeping with tile requirements of the IBC, the approved A failure of tile SPCGIal illsPeeiol' m plans and this do(AUncat, may void dais agreement find the Building Off mial's approval of the Special inspect fil Such a case a new Special inspector and/or firm would need to be proposed for approval, A failure of the design and/or construction, parties to perform in accordance with this aflreernent MaY Nstlit ill as STOP WORK, notice, being posted on tile project until nonconforming iten's have. b0cUresOlved, AC10OWLEDGIVIP,'�1N,M1 I have read and agree to conlplY With the ternisand corlditio,rmS-of Greg Jacobsen sip�lntura Owner: —7-1 Contnactor: R(Dn Turaer-SeaCorl LLC'SignIfture Date 4'7.14 4 7 14 Sha-ma Rafferty-PY0B Date: �4 7, J-4 11144r?z "41,1�/Z41LI;1 Date: 4-7-14 Special ffraY.0 Rabe Signature Special Insp. Agency_ otto Rosenal.i & ASSOCiateS, Inc. ACCEPTE,D1,,F,0R THE MY 9F EMMONDS BUILDTING DErr. Dafa,- ,By: lurumullion by COLAnc4r7n.014