20140520164937510.pdfU0��� N"',
[/�L��T[y�T�
~��—�� ���
May 2t2014
To: Steve Fisher
City ofEdmnnds—Pub|icVVudo
121S1hAvenue North
Edmonds, VVA98OZO
Re: Sherwin Williams (Westgate 228O410OmAvenue West)
Permit No.: BLD28140357
Plan Comments
JPCProject No.: 14-0374
Steve:
Please see the attached drawing revisions for the Sherwin Williams project at Westgate Center.All
changes and additions have been bubbled onthe indicated revised drawing sheets.
1 | would recommend stretching the concrete pad to a minimum of 15' to adequately stage l
side-by-side front -load containers.
0espoinse: 1he new dummpster l,,)ad [ms ix,,em [,icreased to 15"-0p vnlde per the ml"llove
Please contact us regarding any questions or concerns you may have.
Sincerely,
406(;k
Amy Colby
]PCAmhitegs
(4Z5)641-93OUExt. 329
May 9, 2014
TO: Amy Colby — amyc@jparchitects.com
FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235
RE: Review comments for proposed dumpster pad
The proposed plan indicates a concrete dumpster pad measuring 4' by 6' at the rear of the store
along the alleyway. This is a suitable surface for staging the garbage container that will be
serviced at this location.
However, the applicant should strongly consider lengthening the pad in order to accommodate a
recycling container that will collect mainly cardboard and other accepted recyclables. These
weighty metal containers have a tendency to carve out depressions and become difficult to
service if left on an old asphalt surface.
I would recommend stretching the concrete pad to a minimum of 15' to adequately stage 2 side-
by-side front -load containers. Let me know if you have any questions.