Loading...
20140520164937510.pdfU0��� N"', [/�L��T[y�T� ~��—�� ��� May 2t2014 To: Steve Fisher City ofEdmnnds—Pub|icVVudo 121S1hAvenue North Edmonds, VVA98OZO Re: Sherwin Williams (Westgate 228O410OmAvenue West) Permit No.: BLD28140357 Plan Comments JPCProject No.: 14-0374 Steve: Please see the attached drawing revisions for the Sherwin Williams project at Westgate Center.All changes and additions have been bubbled onthe indicated revised drawing sheets. 1 | would recommend stretching the concrete pad to a minimum of 15' to adequately stage l side-by-side front -load containers. 0espoinse: 1he new dummpster l,,)ad [ms ix,,em [,icreased to 15"-0p vnlde per the ml"llove Please contact us regarding any questions or concerns you may have. Sincerely, 406(;k Amy Colby ]PCAmhitegs (4Z5)641-93OUExt. 329 May 9, 2014 TO: Amy Colby — amyc@jparchitects.com FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE: Review comments for proposed dumpster pad The proposed plan indicates a concrete dumpster pad measuring 4' by 6' at the rear of the store along the alleyway. This is a suitable surface for staging the garbage container that will be serviced at this location. However, the applicant should strongly consider lengthening the pad in order to accommodate a recycling container that will collect mainly cardboard and other accepted recyclables. These weighty metal containers have a tendency to carve out depressions and become difficult to service if left on an old asphalt surface. I would recommend stretching the concrete pad to a minimum of 15' to adequately stage 2 side- by-side front -load containers. Let me know if you have any questions.