Loading...
20140606102846520.pdfEDP ity of Edmonds PLAN REVIEW - BUILDING DIVISION (425) 771-0220 DATE: May 15, 2014 TO: Stuart McFeely FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-0384 Project: Scheafer addition Project Address: 21432 86"' Avenue W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may Je result in additional comments.. 'm ,wpc1 , l°lam k On the Residential Building Permit Application: C7,I l 1. Project Valuation — Indicate the estimated cost of the proposed work per ECDC 19.70.015. The amount is required to properly determine permit fees On the Residential Building Permit Application Form A: 2. Mechanical — Exhaust Fans (single duct) — Clarify the difference in the number of fans listed and that of those represented on sheet `A-2' detail 2 — Floor Plan. The amounts should consistently reflect the number to be installed and is required to properly determine the mechanical installation portion of the permit fees. -m- 1), Al MD s -- � c, On sheet A-1: 3. General Notes — Note #1 — Change the code version from `2009' to `20121. 'rif 4. General Notes — Note #2 — Change the wording to include the carbon monoxide installation requirements in existing dwellings per R315.3. t- 5. General Notes — Note #5 — Change the code section for the stair treads and risers from `R311.5' to `R311.7' . ),� 6. General Notes — Note #6 — Change the wording for the measuring point above the finished floor for the emergency escape and rescue opening from "sill ht." to `bottom of clear opening' per R310.1. V` 7, General Notes — Note #8 — Clarify the reference to section `M1508' for the mechanical ventilation requirements. There is no section `M1508' in the 2012 IRC. £ _ a 8. General Notes — Note #8 — Change the code table reference for the minimum required local exhaust rates for `Kitchens, Bathrooms & laundry rooms' from `M1507.3' to `M1507.4'. " 9. General Notes —Note #10 —Insert the wording "...draftstopping per...' n front of `R302.12' to differentiate it from `fire blocking' and its requirements. 10. General Notes — Note #I I — Change the code version from `2009' to `2012'.1 1.1. General Notes — Note #13 — Clarify the reference to section `(SRC) 327' for `security'. Section `R327' regards the requirements for protection against radon. t T1� 12. Structural Notes — Note #2 - Change the seismic design category from `D2' to `D1' per Table R301.2(1). 13. Structural Notes — Note #9 — Indicate on the plans the fasteners and fastener spacing for the attachment of the roof sheathing to meet the requirements of R602.3(1) and guide proper construction and inspection. , t °' �- t M . , 14. Structural Notes — Note #9 — Indicate on the plans the fasteners and fastener spacing for the attachment of the floor sheathing to meet the requirements of R602.3(1) and guide proper construction and inspection. 9A, 01&t, r 1 t ��. 15. Detail 4 — West Elevation — Change the detail number from `4' (or that of the 'East ' Elevation). There appears to be two details numbered `4' on sheet `A-1'. On sheet A-2: 16. DetaiI 1— Foundation Plan — Indicate on the plans the required size, species, and grade of 2 l the beam to be used to support the east end of the cantilevered joists below the `Window Seat' of the `Master Bedroom' to guide proper review, construction, and inspection. 17. Detail 1 — Foundation Plan — Indicate on the plans the required size, species, and grade of , {` the framing members to be used for the cantilevered joists below the `Window Seat' of the r£ 1 Flag `Master Bedroom' to guide proper review, construction, and inspection. 11 Tka" i 2 IcD 4P� rl 18. Detail 2 — Floor Plan — Identify on the plans the areas/uses depicted per the City of Edmonds `Residential Addition/Remodel/Alteration Permit Submittal Requirements. Y-1, 19. Detail 3a — Foundation Detail — Clarify the difference in the required diameter of the anchor .1 bolts specified and that noted in detail `I/A-2' — Foundation Plan — and in note #11 of the 14t Structural Notes on sheet 'A- I' to guide proper construction and inspection 20. Detail 3a — Foundation Detail — Clarify the difference in the required width of the footing Frac 1 9 specified and that noted in detail `1/A-2' — Foundation Plan — to guide proper construction and inspection. i Z). b L r i 1 M 1 �CJHI i &4 Page 2 of 2